Laserfiche WebLink
Brian Kangas foulk <br /> Engineers . Surveyors • Planners ' <br /> • Construct a second trunk line in Franklin Street and Wilson Street to discliarge into <br /> the existing box culvert at CalTrain right-of-�vay. Accommodate and connect off-site <br /> piping at Jefferson Street. <br /> B. Water Line. <br /> • Install a new 12" water line in Franl:lin Street between Jefferson Street and Maple <br /> Street. Connect the water line to the existing 8" water line in Maple Street and the <br /> existing 8" water line in Jefferson Street. <br /> • Install a new 8" water line in the new private street bet�veen Bekins and Building 1 A <br /> and tie into the eaisting 12" �vater line on El Camino. Tliis new ��vater line will <br /> provide fire protection. <br /> • Connect to the existing 12" �vater line on El Camino at intersections with Madison <br /> and Jackson Street. <br /> C. Sanitary Sewer. <br /> • Install ne�v sewer line from tlle north end of Monroe Street to Franklin Street. <br /> Connect sewer in Franklin Street to existing manhole at Wilson Street. The e�isting <br /> Wilson Street sewer will remain. Abandon existin� line in Monroe Street and along <br /> the CalTrain right-of-way. <br /> • Connect existing se«�er lines at E1 Camino i�1to new se���er lines in Madison a�Id <br /> Jackson Streets. <br /> 1::\MAIN\1997\97009>-20.IAC1Correspond�ncc\1999\0G0999.dda.inGa.dcsc.doc <br /> 540 Price Avenue • Redwood City,CA 94063 • (650)482-6300 • FAX(650)462-6399 <br /> Twn nf Fn��r <br />