Laserfiche WebLink
' ATTACHMENT 6(b) <br /> Brian Kangas Foulk <br /> Engineers . Surveyors . Planners • <br /> Description of IAC Shared Infrastructure <br /> Irvine Apartment Communities Phase—Stand Alone <br /> I. Maple Street <br /> • Reconstruct Maple Street between EI Camino Real and the Joint Po���ers Board's <br /> CalTrain right-of-way. <br /> • Realign Maple Street at its intersection with El Camino Real. <br /> • Close and barricade Latlirop Street at tlle intersection with Maple Street. <br /> • Provide a dedicated right and left turn lane on Maple Street at tlie El Camino intersection <br /> and provide a dedicated left turn lane from Maple Street oiito Franklin Street. <br /> II. Franklin Street <br /> • Relocate Franklin Street bet�veen Maple Street and Monroe Street. <br /> • Provide interim transition to the existing roadway beyond the Monroe Street intersection. <br /> • Provide access to existin� Bekins on-grade parkin� lot from Franklin Street. <br /> III. E1 Camino Real <br /> • Modify the traffic signal medians and si�ning and striping at tlle intersection of El <br /> Camino and the reali�ned Maple Street. <br /> • Install frontage improvements on El Camino between Maple Street acld t]ie existing <br /> Bekins building. <br /> • Construct new curb cut at the private street connecting to the Bekins buildin� and <br /> Building 1 A parkin� �ara�e. <br /> IV. Monroe Street - <br /> • Reconstruct Monroe Street bet�veen Franklin Street and the CalTrain ri�ht of way. <br /> • Provide fire truck turnaround at the end of Monroe Street. <br /> V. Public Underground Utilities <br /> A. Storm Drainage. <br /> • Install trunk line from the Red�i�ood Creek outfall near Maple Street to the relocated <br /> Franklin Street. <br /> • Size the line to anticipate future development. <br /> 540 Price Avenue • Redwood City,CA 94063 • (650)482-6300 • FAX(650J 482•6399 <br /> (lna nf Fniir <br />