Laserfiche WebLink
Brian Kangas Foulk <br /> Engineers . Surveyors . Planners ' <br /> B. Water Line. <br /> • Install a ne�v 12" water line in Franklin Street between Monroe Street and Maple <br /> Street. Connect the water line to the existing 8" water line in Franklin Street and the <br /> existing 8" water line in Maple Street. <br /> • Install a new 8" ���ater line in the ne�v private street between Bekins and Building lA <br /> and tie into the existing 12" �vater line on El Camino. <br /> 540 Price Avenue • Redwood City,CA 94063 • (650)482-6300 • FAX(650►462-6399 <br /> Two of Four - <br />