My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-11-18
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-11-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:54:38 PM
Creation date
11/14/2002 4:03:20 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
11/18/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a. Scheme "A' is similar to what now exists, except that new fixtures will be used, <br /> and their placement would be altered to be more dramatic. There would also <br /> be up-lights at the base of the building, adding to the effect. This lighting <br /> scheme is estimated to cost $95~000: - ' ,~ : .~ · _~ <br /> <br /> b. Scheme "B" is to provide color programmable light fixtures at the dome, and a <br /> console for their operation. During normal times, the lights would be white, but <br /> for special events, the. colored lights could be Programmed. This lighting <br /> scheme is estimated to cost $165,000. <br /> <br /> Examples of what the two schemes look like on other buildings can be found in <br /> Section 4 of the "Basis of Design." Examples will also be shown at the Council <br /> meeting. <br /> <br /> 7. Phase II - Architectural Fees. The estimate to create the construction documents <br /> by DES Architects & Engineers is $316,900 plus reimbursables (primarily printing <br /> and copying). This is considered a reasonable estimate for the work to be <br /> performed. As part of their contract, DES will also hire Kreysler & Associates to <br /> help with the FRP design. <br /> <br /> Construction documents ready for bid, should be available in April 2003. <br /> <br /> In approximately one month, the Council will be asked to hire a construction firm <br /> for "pre-construction" services. The company chosen for this work will be familiar <br /> with historic restorations, and will review the plans prepared by DES for <br /> constructability. The estimated fee for this service is $30,000. <br /> <br />8. Budqet. Attachment "C" has a breakdown of the "Construction Cost" estimate. <br /> The current estimate is $4,122,343. This is the construction cost only. Added to <br /> this cost are Architectural and Engineering fees, special inspections, soils report, <br /> and City project management. The estimate does include a 10% construction <br /> contingency. <br /> The cost estimate is based on using FRP as the exterior material, as <br /> recommended by the Council Subcommittee. However, if the Council wishes to <br /> include either lighting scheme or other options, the cost will go up accordingly. <br /> This cost estimate of $4,122,343 compares with the estimate of $3,752,722, which <br /> was presented to the City Council in April (estimate prepared 11/12/01). The <br /> estimate does not include any of the plaza work. In the near future, we will be <br /> coming back to the Council with a Professional Services Agreement for a <br /> consultant to provide design services for the plaza. <br /> <br />9. Discussions with San Mateo Countl/. Nearly all the discussions City staff have <br /> had with the County to date, revolve around the reconstruction of the building, and <br /> obtaining the existing construction documents. Discussions will start soon <br /> regarding the ultimate disposition of the building, and an agreement will be <br /> prepared for approval. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.