Laserfiche WebLink
<br />Men's LifeQuard Shower sfope: <br /> <br />A. - Notify City of any signs of termit~ damage or activity during or after demolition work <br />and allow for treatment by Abatemerlt Contractor of City's choice, at City's expense, <br />prior to commencing repair work. <br />B. - Repair / replace wood framing a$ needed to remove all dry rot, water damaged or <br />termite damaged material in this are$ using Pressure Treated Douglas Fir 2" x 4" or 6"s <br />as required. ! <br />C. - Provide and install pressure reg~lated valve, American Standard, Reliant + <br />Pressure Balance with Screwdriver ~tops. Chrome Finish. (to be supplied by City of <br />Redwood City.) <br />D. - Provide and install, hot tar mem~rane for shower pan. (See plan detail 7 , "Shower <br />Wall on Curb" provided for items: D, IE, and F, Attachment # 1. ) <br />E. - Provide and install 5/8" water re$istant Gypsum board and one coat fire tape. <br />F. - Provide and install smooth coat tnud float to match existing baths for painted walls. <br />G. - Provide and install 2" x 2" ceranlic tiles to match existing baths. Tiles to be set on a <br />%" mortar base with moisture barrie~. <br />H. - Prime and paint bathroom. Col~r and finish to be determined by Owner <br /> <br />I <br />Premise to be kept in a neat and lorderly manner at RII times. <br /> <br />Total price.......... <br /> <br />~" <br /> <br />Combined total f <br /> <br />Ag reement over $10 K 1 0 <br />City Attorney Approved Version 111803 <br />