My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-03-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2007 4:38:38 PM
Creation date
3/8/2007 2:32:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/12/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MONITORING VERIFICATION <br />IDENTIFIED IMPACT RELATED M{TIGATION MEASURE Implementation Monitoring and Timing Signature bate <br /> Enti Verification Entl R uirements <br /> may choose to avoid this intersection <br /> modification in the interest of protecting the <br /> pedestrian environment. This choice would <br /> result in a significant unavoidable impact <br /> based on current CEQA and City criteria for <br /> "intersection Im acts:' <br /> <br />Impact 9-18: Project Contribution to Mit[gation 9-18. This impact would be City; fair-share <br />i <br />b <br />t City; ClCAG If and when improvements <br />City shall conduct <br />ado <br />ted <br />Cumulative Impacts at the Bay Road! <br />Woodside Road Intersection. During the mitigated by implementing the Woodside <br />Road Widening project, which requires m <br />ursemen <br />re <br />from future p <br />, <br />annual traffic monitoring at <br />PM peak hour, project-generated traffic would Caltrans approval. That project is not fatly <br />nor has a design been approved by <br />funded individual <br />project this intersection and <br />implement fair-share <br />increase average delay by flue (5) seconds or <br />which already would <br />more at this intersection , <br />Caltrans. Therefore, implementation of this applicants. requirement when level of <br />, <br />be operating at LOS F. This effect would mitigation is not assured, and this impact is <br />considered significant and unavoidable. service reaches LOS E <br />{average delay of greater than <br />represent a significant impact 55 seconds). Individual <br /> projects may require <br /> Transportation Demand <br /> Management (TDM) plans per <br /> ClCAG ado ted uidelines. <br />impact 9-19: Project Contribution to Mitigation 9-19(a}. Add an eastbound left- Mitigation N!A NIA <br />Cumulative Impacts at the Veterans <br />BoulevardlWhipple Avenue Intersection. In turn lane on Whipple Avenue. This <br />modification would mitigate impacts in the considered not <br />feasible by City <br />the AM peak hour, project traffic would PM peak hour, but not in the AM peak hour. <br />reduce operation from LOS D to LOS F at this In addition, this mitigation would require <br />intersection. In the PM peak hour, project acquisition of right-of-way from commercial <br />' <br />traffic would increase average delay by five is <br />frontage (including a gas station) and <br />(5) seconds or more at this in#ersection, which therefore not considered feasible by the <br />would already be operating at LOS F. These City. This impact therefore would be <br />effects would represent a significant impact, significant and unavoidable. <br /> or or or or <br /> Mitigation 9-19(b}. As a feasible option, City; fair-share City If and when improvements <br /> add a second westbound left-turn lane on reimbursement adopted, City shad conduct <br /> Whipple Avenue. This modification would from future annual traffic monitoring at <br /> reduce the level of impact, but not to a less- individual this intersection and <br /> than-significant level (i.e., would not project implement fair-share <br /> mitigate either the AM or the Ptu1 peak hour applicants, requirement when Ieve1 of <br /> impact). Therefore, although reduced, this service reaches LOE E <br /> impact would remain significant and (average delay of greater than <br /> unavoidable. 55 seconds . <br />Impact 9-20: Project Contribution to Mitigation 9-20(a}. Restripe eastbound <br />Brewster Avenue to one left-turn lane and City; fair-share <br />reimbursement City It ana wnen +mprovemenus <br />adopted, City shall conduct <br />Gumulatfve Impacts at the Veterans <br />BoulevardlBrewster Avenue Intersection. one shared left-through-right tam lane. from future annual traffic monitoring at <br />tersection and <br />i <br />thi <br />During the PM peak hour, project-generated Signal operations would need to be <br />changed to allow for split phasing for the individual <br />project s <br />n <br />implement fair-share <br />traffic would reduce operation to LOS F and <br />increase delay by five (5} seconds or more at eastbound/westbound Brewster applicants. requirement when level of <br />~~ <br />Pogo ~ ~ U:'Jt'fy DocumentslDov~nfow~n Precise Plan4CC sfaff repcrtslCC 3. i2.dcet3. f2.07 Exhibrts',~itachment A mit. monitoring checklist 655.d Et~ D <br />
The URL can be used to link to this page
Your browser does not support the video tag.