My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-03-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2007 4:38:38 PM
Creation date
3/8/2007 2:32:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/12/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MONITORING VERIFICATION <br />IDENTIFIED IMPACT RELATED MITIGATION MEAStJRE implementation Monitoring and Timing Signature Date <br /> Enti Verification Enti Re uirernents <br /> • Temporary Barriers. Construct solid <br /> plywood fences around construction <br /> sites adjacent to residences, <br /> operational businesses, or noise- <br /> sensitive land uses. <br /> • Temporary Noise Blankets. <br /> Temporary noise control 6lsanket <br /> barriers should be erected, if <br /> necessary, along building facades of <br /> construction sites. This mitigation <br /> would only be necessary if conflicts <br /> occurred which were irresolvable by <br /> proper scheduling. (Noise control <br /> blanket barriers can be rented and <br /> quickly erected.) <br /> • Noise Disturbance Coordinator. For <br /> larger censVuction projects, the City <br /> may choose to require project <br /> designation of a "Noise Disturbance <br /> Coordinator" who would be <br /> responsible for responding to any <br /> local compialnts about construction <br /> noise. The Disturbance Coordinator <br /> would determine the cause of the <br /> noise complaint (e.g., starling too <br /> early, bad muffler, etc.) and institute <br /> reasonable measures to correct the <br /> problem. Conspicuously post a <br /> telephone number for the <br /> Disturbance Coordinator at the <br /> construction site and include it in the <br /> notice sent to neighbors regarding <br /> the construction schedule. (The <br /> project sponsor should be <br /> responsible #or designating a Noise <br /> Disturbance Coordinator, posting the <br /> phone number and providing <br /> construction schedule notices. The <br /> Noise Disturbance Goordinator would <br /> work directly with an assigned City <br /> staff member.) <br /> Implementation of these measures would <br /> reduce this intermittent, short-term project <br /> construction-period noise impacts to a less- <br /> than-si n~canf level. <br />(D <br />(10~ ~ <br />Page 25 UaMy Documents) Downtown Precise Plan!CC sfafl reportstCC 3. f 2.doc43. 12.07 Extubifs'Attachmenf A mrt. monitoring checklis? &55.do~" D <br />
The URL can be used to link to this page
Your browser does not support the video tag.