Laserfiche WebLink
MONITORING VERIFICATION <br />IDENTIFIED IMPACT RELATED MITIGATION MEASURE tmpiementation Monitoring and Timing Signature Date <br /> Enti Verbcation Enti Re uirements <br />resulting in intermittent interference with Construction Plan. Prepare a <br />typical existing residential and business detailed construction plan identifying <br />activities, and exceeding the land use/noise the schedule for major noise- <br />level compatibility limits established in the generating construction activities. <br />Redwood Citv Strategic General Plan Noise The constructon plan shall identify a <br />Element. This possibility represents a procedure for coordination with <br />potentiafly signffrcant intermfftenf and nearby noise-sensitive facilities so <br />- <br />short-term noise impact. that construction activities and the • <br /> event schedule can be scheduled to <br /> minimize noise distufiance. <br /> • Construction Scheduling. Ensure <br /> that noise-generating construction <br /> activity is limited to between the <br /> hours of 7:00 AM to 8:00 F'M, <br /> Monday through Friday, and noise <br /> levels generated by construction are <br /> prohibited on Saturdays, Sundays, <br /> and holidays. (Redwood City <br /> Municipal Code Section 24.30) <br /> • Construction Equipment Mufflers and <br /> Mafnfenance. Equip all internal <br /> combustion engine-driven equipment <br /> with intake and exhaust mufflers that <br /> are in good condition and <br /> appropriate for the equipment. <br /> • Equipment Locations. Locate <br /> stationary noise-generating <br /> equipment as far as possible from <br /> sensitive receptors when sensitive <br /> receptors adjoin or are near a <br /> constructian project site. <br /> • Consfrucfio» Traffic. Route aA <br /> construction traffic to and from the <br /> construction sites via designated <br /> truck routes where possible. Prohibit <br /> construction-related heavy truck <br /> traffic in residential areas where <br /> feasible. <br /> • Quiet Equipment Selection. Use <br /> quiet construction equipment, <br /> particular{y air compressors, <br /> wherever possible. <br /> <br />iD <br />V ~ <br />Page 2a U:1My DocumerttsVDowntown Preeise PtantCC staNreportsiCC 3, f 2.docV3.12.01 Exhrt»fsiAttachment A mit.monifonng checklist 655.doi^1 D <br />