My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-03-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2007 4:38:38 PM
Creation date
3/8/2007 2:32:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/12/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MONITORING VERIFICATION <br />IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Enti Verification Enti Re uirements <br />traffic congestion on local roads, possibly In addition, require City review and <br />interfering with emergency access and approval of proposed emergency access <br />response by the RCFD. These possible provisions prior to approval of individual <br />project effects on emergency access and in development projects in the Precise Plan <br />the Precise Plan area represent a potentiapy area. Require individual projects to comply <br />significan# impact. with all applicable City of Redwocxi City <br /> road design and emergency access <br /> standards. T'he City may consider other <br /> alternatives to these requirements if it <br /> determines that such altematives are <br /> feasible and such access will not. jeopardize <br /> emergency response. Implementation of <br /> these measures would reduce impacts on <br /> emergency access and response to a less- <br /> than-si nificant Jevel. <br />Impact 10-6: Emergency Access and Mitigation 10~. Implement mitigation City; individual City Condition of grading permit <br />Response Impacts--Moderate Intensity measures identified in chapter 9 project issuance: fle:ld verify <br />Precise Plan Alternative. Traffic from (Transportation and Circulation) of the EIR applicants implementation during grading <br />potential development under the Moderate to reduce project related traffrc impacts on and construction. <br />Intensity alternative would create additional focal roads to less-than-significant levels. <br />traffic congestion on local roads, possibly In addition, require City review and <br />interfering with emergency access and approval of proposed emergency access <br />response by the RCFD. These possible provisions prior to approval of individual <br />project effects on emergency access and in development projects in the Premise Plan <br />the Precise Plan area represent a potentialiy area. Require individual projects to comply <br />significant impact. with all applicable City of Redwcbd City <br /> road design and emergency access <br /> standards. 'The City may consider other <br /> alternatives to these requirements if it <br /> determines that such alternatives are <br /> feasible and such access will nat jeopardize <br /> emergency response. Implementation of <br /> these measures would reduce irnpacts on <br /> emergency access and response to a less- <br /> than-si nificant level. <br />NOISE <br />Impact i1-1: Precise Ptan-Facilitated Mitigation 11-1. Reduce Precise Ptan Individual . City Condition of grading permit <br />Demolitton and Construction Period Noise. implementation-related individual project project issuance; field verify <br />Demolition and construction activities demolition-and construction-period noise applicants implementation during grading <br />facilitated by the Downtown Precise Plan impacts on nearby residences by and construction. <br />could temporarily elevate noise levels at incorporating cenditions in project <br />nearby residential and commercial receptors demolition and construction contract <br />during individual, site-specific project agreements that stipulate the #ollowing <br />construction periods. Noise levels at 50 feet conventional construction-period noise <br />from the demolition or construction equipment abatement measures: <br />source could reach approximately 105 dBA, <br />CD <br />rte ~ <br />Page 23 U~tMy DocumentslDowntown Precise PlanICC staff repartslCC 3.12.doc13.12.07 ExhibifstAftachment A m8.monitoring checklist 655.dtiC' D <br />
The URL can be used to link to this page
Your browser does not support the video tag.