Laserfiche WebLink
7A <br />Page 108 <br />^ Pedestrian and bicycle circulation and facilities <br />^ Noise and other land use compatibility relationships <br />^ Use regulations (e.g. banks on Downtown Core Streets) <br />^ Public review process <br />Since October, Planning staff has been documenting, categorizing, and studying <br />these Plan related concerns and comments. Staff spoke to consultants for additional <br />technical support when needed. These issues are discussed one-by-one in more <br />detail in Attachmer't B ("Issue Matrix"). The matrix includes an analysis and staff <br />recommendations pertaining to each topic. Please refer to that document for more <br />detail. Staff is recommending some changes to the Draft DPP based on these <br />analyses, as will be discussed later in this staff report. <br />This staff report and attachments are a response to all of the significant comments <br />made on the project at the public hearings and in writing. <br />ENVIRONMENTAL IMPACT REPORT <br />A Draft EIR for the Draft Downtown Precise Plan was prepared per the California <br />Environmental Quality Act (CEQA). The Draft E1R identified potentially significant <br />environmental impacts in the following areas: population and housing, transportation <br />and circulation, aesthetics and visual resources, cultural and historic resources, <br />public services, utilities and infrastructure, noise, air quality, biological resources, <br />and geology and soils. All of these impacts can be mitigafed to less-than-significant <br />levels except for transportation and circulation, and long-term air emissions. The <br />City Council will eventually need to adopt findings and a "Statement of Overriding <br />Considerations" for these few impacts if it approves the Draft DPP. a <br />The 45-day public review period for the EIR was held from November 7 through <br />December 22. Following the public review period, staff forwarded all the comments <br />to the EIR consultant who then wrote "responses to comments". The Draft EIR, <br />together with the received comments (written or oral), list of persons and agencies <br />commenting on the EIR, the response to comments, and appropriate text revisions <br />to the Draft EIR, are all considered to be part of the "Final EIR". It is this "Final EIR" <br />that the Planning Commission must certify at its meeting. <br />The Final EiR includes several key findings. They are: <br />^ In general, the "Moderate Intensity" alternative is environmentally superior to <br />the other alternatives because it would result in the least adverse combination <br />of environmental impacts. This alternative would result in the lowest degree <br />of quantitative impacts, would not result in any additional significant <br />3The Planning Commission is the City's EIR approving body. The Statement of Overriding <br />Considerations is a statement of reasons, or findings, that describe why the benefits of the project <br />outweigh the significant unavoidable impacts outlined in the EIR. Both findings and the Statement of <br />Overriding Considerations will have to be made by City Council before it can approve the Precise <br />Plan. <br />