7A <br />Page 36 <br />unavoidable. This impact is overridden by project benefits as set forth in the <br />statement of overriding considerations. <br />Impact 9-22: Project Contribution to Cumulative Impacts on US 101. <br />Under Cumulative (With Project) Conditions, US 101 southbound segments from <br />SR 92 to Whipple Avenue and from Woodside Road to Marsh Road are expected <br />to have V/C ratios greater than 1.0 in the AM peak hour, and project traffic would <br />increase the volumes on these segments by more than one percent of its <br />capacity. In the PM peak hour, US 101 sou#hbound segments from Whipple <br />Avenue to Marsh Road would experience V/C ratios greater than 1.0, and project <br />traffic would increase the volume on these segments by more than one percent <br />of their capacity. These <br />effects would represent a significant impact. <br />Mitigation 9-22. Mitigation of this impact to aless-than-significant level <br />would require construction of an additions! mixed flow lane. This widening is not <br />deemed feasible due to right-of-way constraints and cost. This impact is <br />therefore considered to be significant and unavoidable. <br />Findings: The changes or alterations proposed by mitigation measure <br />9-22 are within the responsibility and jurisdiction of Caltrans and not the City of <br />Redwood City. Caltrans can and should adopt proposed mitigation measure 9- <br />22. <br />IV. PUBLIC SERVICES, UTILITIES, AND INFRASTRUCTURE <br />A. Wastewater Impacts <br />Impact 10-1: Precise Pfan-Related and Cumulative Impacts on <br />Wastewater Treatnr-_ent and Transmission Capacity--Maximum Intensity <br />Alternative. Precise Plan-facilitated development would increase wastewater <br />generation in the project area. Preliminary estimates indicate that the Maximum <br />Intensity Precise Plan alternative could generate a total of approximately 771,026 <br />gallons of average daily dry weather flow (ADDWF} per day, for a net increase <br />over exiting conditions of 630,885 gpd. Redwood City already uses all of its <br />allocated capacity #rom the SBSA treatment plant, but possesses an option to <br />purchase an additional 1.915 million gallons per day (mgd) of dry weather <br />capacity. The estimated Maximum Intensity alternative related ADDWF <br />increment of 630,885 gpd (0.631 mgd) is less than the City's purchase option of <br />1.915 mgd. <br />In recent years, wastewater flow into the SBSA collection system from <br />Redwood City has occasionally exceeded the current peak wet weather flow <br />capacity right (exclusive of Redwood Shores) of 25.9 mgd. Since 1994-95, the <br />City has exceeded its allocated capacity nine times during the winter. Since the <br />SBSA treatment capacity allocation to Redwood City is already being exceeded <br />during wet weather, the current allocation from the SBSA is inadequate to serve <br />Atty/Reso/Reso.1683 ~ g <br />030707 <br />