My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-03-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2007 4:38:38 PM
Creation date
3/8/2007 2:32:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/12/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MONITORING VERIFICATION <br />IDENTIFIED IMPACT RELATED MITIGATION MEASIJRE Implementation Monitoring and Timing Signature Date <br /> Enti Verification Enti Re uirements <br /> (3) Salvage. If the affected historic <br /> resource can neither be preserved at its <br /> current site nor moved to an alternative site <br /> and is demolished, the project applicant <br /> shall consuls with the Redwood City Historic <br /> Resources Advisory Committee and other <br /> local historical societies regarding salvage _ _ <br /> of materials from the affected historic <br /> resource for public information or reuse in <br /> other locations. Demolition may proceed <br /> only after any significant historic features or <br /> materials have been identified and their <br /> removal completed. <br /> (4) Commemoration. If the affected <br /> historic resource can neither be preserved <br /> at its current site nor moved to an <br /> alternative site and is demolished, the <br /> project applicant shall, with the assistance <br /> of the Redwood City Historic Resources <br /> Advisory Committee or other professionals <br /> experienced in creating historical exhibits, <br /> incorporate a waft display featuring historic <br /> photos of the affected resource and a <br /> description of its historical signifir~nce into <br /> the publiGy accessible portion of any <br /> subse uent develo ment on the site. <br />TRANSPORTATION AND CIRCULATION <br />Impact 9-1: Impact on Mitigation 9-1. The intersection of City; fair-share City; ClCAG If and when improvements <br />BroadwaytWoodside Road (SR 64) Broadway and Woodside Road (SR 84) reimbursement adopted, City shall conduct <br />intersection--Maximum Intensity Precise currently has five approach legs. The fifth from future annual traffic monitoring at <br />Plan Alternative. During the AM peak hour, leg of this intersection (the southbound US individual this intersection and <br />the Maximum Intensity project traffic i 01 off-ramp) is a major contributing factor project implement improvement and <br />increment would reduce the level of service to poor intersection operations. Currently applicants. fair-share requirement when <br />(LOS) and increase average delay by more the San Mateo County Transportation level of service reaches LOS <br />E (average delay of greater <br />than five (5) seconds at the <br />BroadwaylWoodside Road intersection. Authority (SMCTA) is studying irrrprovement <br />options for the US 101NUoodside Road than 55 seconds). Individual <br />During the PM peak hour, the Maximum interchange. One of the optons would projects may require <br />Transportation Demand <br />Intensity project would increase the average <br />which would already <br />delay at this intersection include modifications of this intersection to <br />a standard 4-leg configuration. At this time, Management (TDM) plans per <br />, <br />be operating at LOS F, by more than five (5) however, no feasible modifications have C/CAG adopted guidelines. <br />seconds. These changes would represent a been identified with implementation <br />significant impact. assured to allow this intersection to operate <br /> at an acceptable level of service; therefore, <br /> the addition of Maximum intensity project <br /> traffic is expected to result in a significant <br /> unavoidable im act <br />y <br />.D <br />Peee ~ U:4My Do~umentstUowntown Predse A!anICC staff report5lCC 3. f 2.doct3.12.07 ExhibitslAftachment A mit.moniloring checklist 655.doc~ D <br />
The URL can be used to link to this page
Your browser does not support the video tag.