Laserfiche WebLink
p MON[TORING VERIFICATION <br />IDEN~D IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Enti Verification Ent' R uirements <br />air qua itThis would represent a Water active demolition areas to <br />potentla significant impact. control dust generation durng <br /> demolition of structures anti break- <br />N up of pavement. <br /> <br />O <br />^ Cover aik trucks hauling demolition <br />p debris from the site. <br />W <br />W <br />• Use dust-proof chutes to load <br /> debris into trucks whenever <br /> feasible. <br /> During all construction phases: <br /> • Water alt active construction, areas <br /> at {east twice daily. <br /> • Water or cover stockpiles of debris, <br /> soil, sand, or other materials that <br /> can be blown by the wind. <br /> • Cover all trucks hauling soil, sand, <br /> and other loose materials, or <br /> require all trucks to maintain; at least <br /> two feet of freeboard. <br /> • Pave, apply wafer three times daily, <br /> or apply (non-toxic} soil stat:~ilizers <br /> on all unpaved access roads, <br /> parking areas, and staging areas at <br /> construction sites. <br /> • Sweep daily (with water sweepers} <br /> all paved access roads, parking <br /> areas, and staging areas at <br /> construction sites. <br /> • Sweep streets daily (with water <br /> sweepers) If visible soil material is <br /> carried onto adjacent public sUeets. <br />~ Hydroseed or apply (non-toxic) soil <br />~ stabilizers to inactive construction <br />~ ~ areas (previously graded areas <br />~ ~ inactive for ten days or more). <br /> <br />~p <br />W Cfl <br />EnGose, cover, water twice daily, or <br /> apply (non-toxic) soil binders to <br /> ex osed stock Iles dirt, sand, etc. . <br />Page 28 UaMy DocumentslDownfew Precise PfantCC staff reportslCC 3. t2.c!oct3,12.07 Exh+bitslAttachment A mif.monrforing checklist 655.doc <br />