Laserfiche WebLink
p MONITORING VERIFICATION <br />iDEND IMPACT RELATED MITIGATION MEASURE tmplementation Monitoring and liming Signature Date <br /> Enti Verbcation Enti Re uirements <br />v <br />o Limit traffic speeds on unpaved <br />Z7 roads to 15 miles per hour. <br />fD <br />~ <br />O Install sandbags or other erosion <br />~ control measures to prevent silt <br />~ runoff to public roadways. <br /> <br />~''~ Replant vegetation in disturbed <br /> areas as quickly as possible. <br /> • Consult with BAAQMD prior to <br /> demolition of structures suspected <br /> to contain asbestos to ensure that <br /> demolition/construction work is <br /> conducted in accordance with <br /> BAAQMD rules and regulations. <br /> The following are measures to control <br /> emissions by diesel-powered construction <br /> equipment used by construction <br /> contractors, where applicable: <br /> • Ensure that emissions from all on- <br /> site, diesel-powered construction <br /> equipment do not exceed 40 <br /> percent opacity for more than three <br /> minutes in any one hour. Any <br /> equipment found to exceed 40 <br /> percent opacity (or Ringelmann 2.0) <br /> shall be repaired or replaced <br /> immediately. <br /> ^ The contractor shall install <br /> temporary electrical service <br /> whenever possible to avoid the <br /> need for independently powered <br /> equipment (e.g., compressors). <br /> • Diesel equipment standing idle for <br /> more Phan three minutes shall be <br />~ turned off- This would inGrrde <br />~ trucks waiting to deliver or receive <br />~ ~ soil, aggregate, or other bulk <br />~# ~ materials. Rotating drum concrete <br />p v trucks could keep their engines <br />~~ <br />W ~ <br />running continuously as long as <br /> they were on-site and away from <br /> residences. <br />PaOe 29 U;IMy Documents!Dewnfown Precise P(antCC staff reports!CC 3. t2.doc!3.12.07 Exhibits!AttachmentA mif, monrforing ~heckfist 655.doc <br />