My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2000-2009
>
2007
>
Res07 14769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2007 9:14:11 AM
Creation date
4/5/2007 9:06:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
p MONITORING VERIFICATION <br />iDEND IMPACT RELATED MITIGATION MEASURE tmplementation Monitoring and liming Signature Date <br /> Enti Verbcation Enti Re uirements <br />v <br />o Limit traffic speeds on unpaved <br />Z7 roads to 15 miles per hour. <br />fD <br />~ <br />O Install sandbags or other erosion <br />~ control measures to prevent silt <br />~ runoff to public roadways. <br /> <br />~''~ Replant vegetation in disturbed <br /> areas as quickly as possible. <br /> • Consult with BAAQMD prior to <br /> demolition of structures suspected <br /> to contain asbestos to ensure that <br /> demolition/construction work is <br /> conducted in accordance with <br /> BAAQMD rules and regulations. <br /> The following are measures to control <br /> emissions by diesel-powered construction <br /> equipment used by construction <br /> contractors, where applicable: <br /> • Ensure that emissions from all on- <br /> site, diesel-powered construction <br /> equipment do not exceed 40 <br /> percent opacity for more than three <br /> minutes in any one hour. Any <br /> equipment found to exceed 40 <br /> percent opacity (or Ringelmann 2.0) <br /> shall be repaired or replaced <br /> immediately. <br /> ^ The contractor shall install <br /> temporary electrical service <br /> whenever possible to avoid the <br /> need for independently powered <br /> equipment (e.g., compressors). <br /> • Diesel equipment standing idle for <br /> more Phan three minutes shall be <br />~ turned off- This would inGrrde <br />~ trucks waiting to deliver or receive <br />~ ~ soil, aggregate, or other bulk <br />~# ~ materials. Rotating drum concrete <br />p v trucks could keep their engines <br />~~ <br />W ~ <br />running continuously as long as <br /> they were on-site and away from <br /> residences. <br />PaOe 29 U;IMy Documents!Dewnfown Precise P(antCC staff reports!CC 3. t2.doc!3.12.07 Exhibits!AttachmentA mif, monrforing ~heckfist 655.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.