My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-04-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-04-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 1:05:38 PM
Creation date
4/5/2007 3:09:04 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
4/9/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9A <br /> Page 46 <br /> Honorable Mayor 1'ierce and Ciry Council <br /> April 3, 2007 <br /> Page 5 <br /> Here, unlike Sundstrom, prior co adoption of the IS/MND, a Traffic Impact Analysis <br /> was prepared to evaluace ehe pocential for the projecc �o result in traffic impacts and, based on thar <br /> sti.idy, the ISIMND concluded that any traffic impacts would be Iess than significant. The Ciry <br /> thereEore correctly determined tliat no micigation was required. (See CEQA Gttidelines g <br /> 15126.4{A)(3) ["mitigacion measures are not required For effects which are not f�und to be <br /> significant"].) The Planning Commission appropriately recommended adoption of the IS/MND <br /> given the ftnding of a less-than-significant impact. (See Publ:c Resourc�Code y� 21064.5, <br /> [�er►nitt'sng tl�e adaptioa cf rnitigared negacive deciarations where the project as mitigated wiii res«it <br /> i�i no signi�cant effects on the e;ivironri7enc�.} Accore�ingiy, rhe trairic monitoring reporr wili noi <br /> serve as mitigation f�r a potential project impact, as the Iinpacc Ana]ysis has already found thac chere <br /> is no poten�ial in�pacc, nor will it provide an evaluation oFpote��tial impacts, as they have already <br /> becn evaivated. 'I"rie purpose of the monitoring reporr would only be co update the Ciry on the <br /> c�rrent traffic condicions in the grearer neighborhood surrotzncling the Projecc. The Planning <br /> Can�mission concurred with rhe less-thac�-significant craffic impact finding when ic adopted tlie <br /> IS/MND, and it did not caIl inco qtiescian �he accurary of the Iinpact Analysis, but simply requesred <br /> inonit�ring oF the project after occupancy to confirm the r.esults of the study and to fiirther assure <br /> t(�at the neighborhood's coi�ce�-ns were addressed. For these reasons, the monitoring repc�rt is <br /> appropriare. <br /> Hazardous Materials <br /> Coinments also were raised by the Hampton Oaks �wners Association concerning <br /> t}�e preser�ce of soil and brounc�water contaminauon at the site due ro a major fuel spill ac a <br /> neigl�boring property in 1�95. The City's IS/MND contained an evaluatioii of any poter�tial <br /> l�azards and hazardous materials i►npaccs associated with the proposed Projecr. Based on rhe <br /> ISIMND analysis, che City concluded that tEie Project would have a less-than-significant impacr and <br /> r��ac no mitigario�� is req��i��eci. (IS/MND at p. 20.} <br /> The IS/MND's conclusions were based on Remediation I�escing and I�esign's August <br /> -/t, 2006 "Reporc of Soil Investigations at 885 Woodside Road and 21 Horgan Avenue, Redwood <br /> C.;iry, <;alifornia" {"RTD Reporc"). 'T"he IZ�T'I� Repore specifically examined the Project site for <br /> �7iiiC'tlClnl CQ[1C�iiilili�iLiiiii uIIC tii fitiLiOic:CiIT1 iiy�fOCarl�on;, SLiCii �I� ���SOSiItC� ail� i0iti"iCl iiC) OI7-S1L(' <br /> conr.a�l�inatic�n. As noted in rhe IS/MND> aIl soils sampled by 1Z�I�D froin I2 feet below ground <br /> level and above found that gasoline-z�elarec3 perz-oleum l�ydrocarbons werc "below ]aboratory <br /> CC��Of"C111P I1fTl1C5.� (IS/i'�1?�iD a� p. 2{).} �~urrl�er, RTD examined t�ie reported groundwater plunie <br /> fre�m rhe C_�as & Shop fuel station at �i`)5 Wc>oclside �Zoac{, which restilred from �he 1995 release of <br /> gasolii�e du��ing re��lacerrient of uildergro�ind s�orage tanks, and cond�ided tl�at exravacion for tl�e <br /> project's below-grade parlcin��arage will i�ot reach tlie depth of the groundwa�er pluine and will <br /> encc�tir�ter only "cleari" soil cha� can be �lis��osed of in a inanner approp��iate co any otlier °clean" site. <br /> We tii�i�erstand that che San ,'��Iateo C:oi�nry Health Department (SMCHD} has c:onfirn�ed the <br /> accuracy of tl�ese conc:Ilisions. <br /> Based an a request fsom SMC;I-�D, Nicholson Lamb Ventures will irnplernen� a sail <br /> and grouridwater ►nanagetnent plan as part of tl�e Project co manage soils and grounc�water�iuring <br /> 99999194t)fi2v5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.