Laserfiche WebLink
_ q,�-4� <br /> Table A3 • . <br /> Daily �nd Pealc Honr Trtp Generatlon Comparison <br /> Yal� Hoar Tri s* , <br /> Pro ect Alternative Dail Td . Totat In Ont <br /> F' <br /> ved Pro'ect 12,458 1 199 564 636 <br /> Revised 'cct 11640 1,081 548 533 <br /> Di erence -818 -118 -16 -103 <br /> %Di esence -7% -109b -3°rb -16% <br /> Sa <br /> A ved Pro'ect 18,531 2,099 1,098 1001 <br /> RevisedPro'ect 18,498 2,080 1,087 993 <br /> Di erence -33 -19 -11 -8 <br /> 90 Di erence 0% -1 % . -I % -1 % <br /> • Friday peak hour is 4:00 m 5:00 PM; Ssturday peak hour is 3:00 W 4:00 PM. <br /> Soura: Fehr 8c Peas Aesociates <br /> The peak hour trafSc volume reductions with the revised projcet would also be greater during the Friday <br /> peak hour than during the Saturday peak ho�a. The revised projcet would' genecate 118 fewer Friday peak <br /> hour hips and 19 fewer Sat�sday peak hour hips than the approved project These changes represent <br /> reductions of 10 percent and 1 percent, respectively. <br /> Proiect Tria Assienment <br /> The onsite parldng for the revised project will primarily be located on Block 1: the revised project would <br /> include between 215 and 590 pazldng spaces undemeath the mixed-use building, depending on wtrich <br /> plan for the block is selected. In addition, 100 surFace parldng spaces would be added to Block 2. For <br /> comparison, the onsite pazldng for the approved project was located solely on Block 2. T'hese differences <br /> in pazldng locations will affect project riaffic circulation neaz the site? <br /> The peak hour revised project traffic estimates were assigned to the surrounding roadway system based <br /> on the uip distribution pattem presented on Figure 26 (p. 78) in the Draft EIR and the portion of the proj- <br /> ect's parking demand provided on Block 1 and on Block 2. The remaining project traffic (that is, the <br /> vehicles not accommodated in the net additional parldng spaces provided as part of the project) will park <br /> in onstreet spaces or in other offstreet pazldng facilities. The share of project iraffic assigned to each of <br /> the parking facilities was based on their amount of available parldng. <br /> As an example, the traffic dishibution assignments for the 69'J-parldng space altemarive (590 spaces on <br /> Block 1 plus ]00 new spaces on Block 2) are based on the assumption that: <br /> • Approximately 50 percrnt of the Friday peak hour project traffic and 25 percent of the Saturday <br /> peak hour project traffio- will use the Block 1 onsite spaces, and <br /> • Approximately 25 percent of the Friday peak hour project traffic and 20 percrnt of the Saturday <br /> peak hour project traffic will use the Block 2 spaces. <br /> = The revised project will add traflic to the outlying intersections, but in smalla amounts then d�e approved projeM. <br /> A4 <br />