Laserfiche WebLink
I.�� <br /> Tiaffic c'vculation associated_ with dropping off: ginema pah�ons is also inclu�ed. The resulting trip <br /> assignmeaffi at the adjaxnEinbersoctions�for the=69p-spa�aatteinative ar� illushated in Figune Al. <br /> Baseline Intersection Oneratlons <br /> _ .. <br /> Levei of service calculations were conducted W evaluate the operations of the adjacent intersections under <br /> baseline and baseline-plus-project conditions during tl�e Friday evening and Saturday aftemoon peak <br /> hoius. The baseline condition is de5ned as the existing condition plus expected changes that are not <br /> associated with the proposed project In this case, the baseline condition was updated to include �c <br /> from the of5ce building located at 500 Arguello S�eet, which was approved subsequent W the analysis of <br /> the approved project, as well as irafFc from the Fox Theater.' The results are prosenud in Table A4. The <br /> calculation sheets are on file with the City of Redwood City. <br /> Table A4 <br /> Bsseline and Fbtare Wit6-Project Intersection Levels of Service <br /> With RevLced Pro ect <br /> With 315 - WiW 550 With 690 <br /> Withoat Pro'ect Parkin S aces Parkin S aces Parkin S aces <br /> Intersection LOS Dela LOS Dela LOS Dela LOS ; <br /> F ' PMPeakHrna 4:00-S:OOP - - - <br /> 8 Broadwa /MiddleSeld A 4.0 A 4.6 A 4.7 A 4.7 <br /> 9 Broadwa /Jeffecson A 4.4 B 5.5 B 5.9 . B i 6.0 <br /> 13 Middlefield/Jeffecson C i 8.2 C 20.5 C 20.5 C 20.7 <br /> 14Middlefield/Winslow A 3.0 C 14.0 C 10.1 B ; 9.1 <br /> Saturd A ernoon Peak Hour 3: 00-4: 00 P <br /> 8 Broadwa /MiddleSeld A 2.0 A 4.2 A 4.2 A ; 4.5 <br /> 9Broadwa /Jeffetson A 4.3 B SJ B 5.6 B j 5.9 <br /> _ 13 Middlefield/Jefferson C 16.6 C 18.9 C 19.0 C ; 18.9 <br /> 14 Middlefield/Winslow A 0.8 A 4.5 A 2.5 A I 2.6 <br /> LOS = Level of Service <br /> Delay = Average stopped delay (in seconds) per velilcle for signalized intersections and total average delay (in <br /> seconds) per vehicle at unsignalized intersections. Intersection ]4 is unsignalized. <br /> Source: Fehr & Peers Associates, Inc. <br /> The addition of project traffic would cause the following changos in levels of service: <br /> • The addition of project traffic for each of the three altematives would change operations at the inter- <br /> section of Broadway and Jefferson Avenue from LOS A to LOS B during the Friday evening and <br /> Saturday afrernoon peak hours. <br /> 3 Traffic expected in conjunetion with the "Li[[le Fox" is not inc':uded ia these figures, bu[ is included in the <br /> analysis of cumulative traffic conditions. <br /> AS <br />