Laserfiche WebLink
�1.�5f� <br /> conducted in 2000) plus estimated parldng demand for approved but not-yet-cons�ucud developmenis. <br /> The total dematrd (backgrowid plus project demand) was incrcased by a 10 peloent factor to incorpoiate a <br /> parlang vacancy allowance�. <br /> The comparisons of the overall parldng demands and supplies and resuking suepluses and deficits for the � <br /> approved project and for the revised project with the Haee parldng altematives (315, 550, or 690 spaces) <br /> for Friday and Sahuday conditions are presented in Table A9. <br /> Friday Resultc <br /> During the day, downWavn parldng demand with the revised project would be lower than the P�8 <br /> demand with the approved project The reduced demand would result from the elimination of office <br /> space on Block 2 with the revised projxt In the evening, the pazldng demands would be very similar. <br /> The approved projxt was projectedto have paridng deficits occ�aring during three one-hour ptriods on <br /> Fridays. A peak hourly parldng deficit of 263 spaces was projected to occur around 1:00 PM. <br /> The revised project is projected to have parking deficits during thtee one-hour periods with the 315-space <br /> and tiie 550-space alternatives. With the 315-space altemative, a peak houdy parldng deficit of 358 <br /> spaces is projected to occur at 1:00 PM. With the 550-space altemative, a peak houdy deficit of 123 <br /> spaces is projected to occur at 1:00 PM. No pazldng deficits an projected to occur with the 690-space <br /> altemabve. <br /> Saturday Resulu - <br /> Pazidng surpluses are projected to occur during Saturday condiNons for both the approved and the revised <br /> projecu, under all three parlang ypace alternarives. <br /> Analvsis Usin¢ Uadated Parkin¢ Demand Estimates <br /> An updated pazking impact analysis wu completed to reflect changes in parlring demand that have <br /> evolved in downtown Redwood City between the time the origina] pazldng analysis data collec6on effort <br /> was completed, in 2000, and the present time. Pazlang surveys were conducted on three Fridays in April <br /> 2002 to measure the current parldng demand in downtown Redwood City. The updated survey results <br /> were used to evaluate cuirent Friday pazldng condirions for the revised project. (Saturday conditions <br /> were not revisited, since lazge pazldng surpluses are projected with no Saturday parldng impacts.) <br /> In conjunction with this revised demand estimate, the pazldng supply esrimate was revised to include only <br /> public parking spaces (both onstreet and offstreet) owned by the City of Redwood City; no spaces owned <br /> by other public agencies, such as Caltrain, SamTrans, or the County of San Mateo, or private spaces are <br /> assumed to be available 5 This inventory is more conservative than the one used in the original approach <br /> because it assumes that fewer spaces are available. <br /> ° The number of parking spaces should exceed the parking demend to minimiu traffic ciroulation caused b o le <br /> y pe p trying to <br /> find the empty spaces during peak periods. <br /> 5 Information about the number of spaces in lots owned by other public agencia and private lots is included in this <br /> appendix for completrness, but those spaces are not included in the pazldng impec[ analysis. <br /> A13 <br />