Laserfiche WebLink
<br />REDWOOD CITY LEVEE PROJECT <br />LEVEE SEGMENTS III & VII <br /> <br />March 13, 2006 <br /> <br />Upon completion of design and City approval of the PS&E, the Consultant shall provide to the City a <br />reproducible set of Final PS&E drawings and electronic files of the drawings, a camera-ready set of <br />supporting technical specifications, and the final Estimate of Probable Construction Cost. <br /> <br />Work Not Included in this Scope of Work: <br /> <br />. <br /> <br />Environmental clearance activities <br />Landscaping or Plantings <br />Irrigation System, except as speeifically provided for in this Scope-of-Services <br />Right-of-Way activities, except as specifical1y stated in this Scope of Services <br />Utilities relocation and design, including potholing of existing lines <br />Provide new topographic mapping <br />Application fees for permits or fees of any kind <br />Reproduction of the construction bid documents <br />Preparation of the Storm Water Pollution Prevention Plan (SWPPP) <br />Construction services of any kind <br />Construetion staking <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br />