Laserfiche WebLink
<br />REDWOOD CITY LEVEE PROJECT <br />LEVEE SEGMRNTS III & VII <br /> <br />March 13, 2006 <br /> <br />For Site 1 (SBSA): <br /> <br />. <br /> <br />The Consultant shan prepare conceptual levee alignments and coordinated them with the City and <br />SBSA. <br /> <br />. <br /> <br />Based on the agreed conceptual alignment, the Consultant shall prepare a preliminary earth fill <br />levee and levee wall alignment and corresponding preliminary construction cost estimates and <br />submit them to the City for approval. The layout of the levee will be coordinated with the City <br />and SBSA. <br /> <br />. <br /> <br />Based on the Geotechnical recommendations and City/SBSA alignment approval, the Consultant <br />shall prepare Structure General Plans and refmed preliminary construction cost estimate and <br />submit to the City for approval. After obtaining approval from the City, the Consultant shall <br />prepare final design and construction bid documents. <br /> <br />. <br /> <br />Based on our meeting with the City, il is assumed that the City will continue maintaining the <br />earth fill levee in front of the SBSA plant. The concrete levee wall and earth fill levee will be a <br />secondary defense to protect the plant from the high tide condition. The levee wall will not be <br />designed for the extreme wave and tide water level. <br /> <br />. <br /> <br />It is assumcd that the City will provide the high water elevation information. The top of levee <br />will be 2 to 2.5' above the high water elevation. <br /> <br />. <br /> <br />Included in this Scope-of-Serviees shall be the modifications to the existing irrigation systems to <br />made the system functional after impacts and removals due to the levee project. Landseaping or <br />planting are not part of this scope-or-services. <br /> <br />. <br /> <br />The Consultant shall provide additional field survey to confirm existing topographic features, <br />such as elevation along the approved levee wall alignment, and for the development of cross- <br />sections. <br /> <br />. <br /> <br />The Consultant shall prepare plats and legal descriptions for construction and maintenance <br />easements along the approved levee alignment. <br /> <br />The Consultant shall makc design submittals at the preliminary, 95% and 100% (final) level of <br />completion. <br /> <br />The Consultant shall prepare Estimates of Probable Construction Costs for each submittal. The Final <br />Estimate of Probable Construction shall be submitted with the final PS&E. <br /> <br />Final design shall be in accordance with City of Redwood City's standards. <br /> <br />The Consultant shall provide sufficient sets of submittal drawings for the City and other reviewing <br />agencies for each submittal. <br />