My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt01 CCS Planning & Engineer
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2001
>
Agmt01 CCS Planning & Engineer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 6:58:04 PM
Creation date
3/26/2002 11:41:34 AM
Metadata
Fields
Template:
Agreement
Contractor Name
CCS Planning & Engineering
PROJECT NAME
Consulting engineering svcs - RWS levee segment III improvements
RMP File Number
304
Date
8/10/2001
Reso Ref
14267
MO Ref
02-125
Task Order
Yes
Box
6589
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REDWOOD CITY LEVEE PROJECT <br />LEVEE SEGMRNTS III & VII <br /> <br />March 13, 2006 <br /> <br />For Site 1 (SBSA): <br /> <br />. <br /> <br />The Consultant shan prepare conceptual levee alignments and coordinated them with the City and <br />SBSA. <br /> <br />. <br /> <br />Based on the agreed conceptual alignment, the Consultant shall prepare a preliminary earth fill <br />levee and levee wall alignment and corresponding preliminary construction cost estimates and <br />submit them to the City for approval. The layout of the levee will be coordinated with the City <br />and SBSA. <br /> <br />. <br /> <br />Based on the Geotechnical recommendations and City/SBSA alignment approval, the Consultant <br />shall prepare Structure General Plans and refmed preliminary construction cost estimate and <br />submit to the City for approval. After obtaining approval from the City, the Consultant shall <br />prepare final design and construction bid documents. <br /> <br />. <br /> <br />Based on our meeting with the City, il is assumed that the City will continue maintaining the <br />earth fill levee in front of the SBSA plant. The concrete levee wall and earth fill levee will be a <br />secondary defense to protect the plant from the high tide condition. The levee wall will not be <br />designed for the extreme wave and tide water level. <br /> <br />. <br /> <br />It is assumcd that the City will provide the high water elevation information. The top of levee <br />will be 2 to 2.5' above the high water elevation. <br /> <br />. <br /> <br />Included in this Scope-of-Serviees shall be the modifications to the existing irrigation systems to <br />made the system functional after impacts and removals due to the levee project. Landseaping or <br />planting are not part of this scope-or-services. <br /> <br />. <br /> <br />The Consultant shall provide additional field survey to confirm existing topographic features, <br />such as elevation along the approved levee wall alignment, and for the development of cross- <br />sections. <br /> <br />. <br /> <br />The Consultant shall prepare plats and legal descriptions for construction and maintenance <br />easements along the approved levee alignment. <br /> <br />The Consultant shall makc design submittals at the preliminary, 95% and 100% (final) level of <br />completion. <br /> <br />The Consultant shall prepare Estimates of Probable Construction Costs for each submittal. The Final <br />Estimate of Probable Construction shall be submitted with the final PS&E. <br /> <br />Final design shall be in accordance with City of Redwood City's standards. <br /> <br />The Consultant shall provide sufficient sets of submittal drawings for the City and other reviewing <br />agencies for each submittal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.