My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 LSA Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 LSA Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2008 11:43:46 AM
Creation date
5/9/2007 11:36:51 AM
Metadata
Fields
Template:
Agreement
Contractor Name
LSA Associates, Inc
PROJECT NAME
Agreement for Professional Services
Date
5/3/2007
MO Ref
MO 07-055
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />L S ^ I <br /> <br />I <br /> <br />LSA ASSOClATES, INC, <br /> <br />2215 FIFTH STREF.T <br />BERKE1.EY, CAUFORNIA 94710 <br /> <br />510.540.7331 TH <br />510.540.7344 FAX <br /> <br />CARLS8AD IRVINE <br />COl.MA PALM SPRINGS <br />FORT COLLINS POINT R1CHMOND <br /> <br />RIVERSIDE <br />ROCKLIN <br />SAN LUIS OBISPO <br /> <br />January 31, 2008 <br /> <br />Tom Passanisi, AICP, Principal Planner <br />Planning Division <br />City of Redwood City <br />1017 Middlefield Road <br />Redwood City, CA 94063 <br /> <br />Subject: <br /> <br />Budget Augment for The Preserve at Redwood Shores Project EIR <br /> <br />Dear Mr. Passanisi: <br /> <br />LSA is requesting approval of a budget augment of $3,800.00 to the existing approved budget of <br />$177,230.00 for a total budget of$181 ,030 for preparation of The Preserve at Redwood Shores Project <br />EIR. <br /> <br />The budget as approved included a contingency of $11,065 which required your prior approval to use. <br />You approved an expenditure of$1,360.00 from the contingency on June 7,2007 to have LSA assist <br />the City wiLlJ. tribal consultation which is required by State Law for a General Pla...'1 Amendment. The <br />scope of work included funding for a Northwest Information Center records search and staff time to <br />send the survey results to Ms. Sayers, the tribal representative that requested consultation in response <br />to our initial notification. <br /> <br />On September 14,2007, you approved an expenditure of $9,200 for the visual simulations. With this <br />approval, $10,560 of the $11,065 contingency had been authorized to be used. After providing <br />comments on the draft versions of the simulations we provided fmal versions of the simulations in <br />October. 2007. Subsequently, you asked that the simulations be provided without any landscaping, <br />and also with smaller, younger vegetation. On November 26,2007, you approved additional visual <br />simulation work to provide these views at a cost of $2,450 and confmned that if there were insufficient <br />funds in the budget to cover this amount, additional funds would be requested from the applicant. <br /> <br />Other out of scope services provided during the preparation of The Preserve EIR included: <br /> <br />Providing more copies of the Administrative Draft EIR (18 instead of 5), the Draft EIR (80 instead <br />of 50), and the RTC (42 instead of 30) than provided for in the approved scope of work. <br /> <br />. Reviewing three versions of the transportation impact analysis, requiring revising the <br />transportation section twice. <br /> <br />. Receiving the City's comments to the administrative drafts and screen check drafts from several <br />commenters, instead of a single consolidated and reconciled set of comments as specified in the <br />approved scope of work. <br /> <br />PLANNING <br /> <br />BNVlllONM'ENTAL <br /> <br />DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.