My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 Mark Thomas & Co, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Under $60K
>
Agmt07 Mark Thomas & Co, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2013 11:23:06 AM
Creation date
5/9/2007 3:05:04 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Mark Thomas & Co. Inc.
PROJECT NAME
Agreement for Civil Design Services Redwood Shores Lagoon Maintenance Boat Ramp Extra Work #1
Date
6/15/2010
Amendment
Yes
Box
7213
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Mr, Brian Lee <br /> <br />Page 2 of4 <br /> <br />412112010 <br /> <br />Del/verables: <br /> <br />)> Field survey points file and topo map for the project area. <br /> <br />The esllmaled budget/oJ' this work;s $5,100. <br /> <br />2) Design Plan~J SI)ecltlcat,loJls ml(l Cost Estimate <br />MTCo will \vork with the city and the City;s h~rvesthlg contractor to de$igll ~ ~oat ramp for <br />maintenance access to the lagoon for harvesting tbe widgeon weed and other algae foi'lUs that <br />infest the lagooll d\\ring sununer lUo~ths., Th~ desJgn would include modifying and extending <br />the decorativeJ metal railing at Shannon Park aroUtla the boat ramp tQ discourage pub.Hc use ot <br />the ramp. The design would include a look able decorative gate to match the railing. Design <br />wOlJld include an 80% and 100% submittal for City review and final COllstmction D9CU~lle~~t~ <br />as follows: <br /> <br />A) Pl'eUm1nR1'Y De$lgll (80% PS&E) <br />o One meeting wlth City and City~s harvestor contractor to review preliminary plans <br />o Title Sheet <br />o LaYOllt and Grading plan <br />o Construction details <br />o Staging Plans (coff~l'dam) <br />o Dra~ t~~hnical specifications <br />o P!'eliminary construction cost estimate <br /> <br />Deliver(lbles: <br /> <br />)> Three (3) balf-slze ~~ts oftl~e ~O% Plans (11 Ux17U) <br />> Three (3) copies of1he Technical Specifications <br />)> Three (3) copies of the preliminary Constmctioli Cost Estimate <br /> <br />B) FillAI neslgn (100% PS&E) <br /> <br />The 100% PS&E will incorporate conunen,s from t\le 80% ~\\b1Uittal r~vi~w~ The 100% <br />PS&E will be revised to add the required detail and design hifonnation. At this pointJ tbe draft <br />boilerplate \Viii he t\dde~ to ~he 100% Teclmlcal Specifications and . the complete <br />Specifications will be fully edited to the specific project requirements. The pretiminalY cost <br />estimate will be updated based on the 100% plans and specifications. <br /> <br />Dellver(lbles: <br /> <br />)> TIU'ee (3) review sets of the 100% PS&E <br />
The URL can be used to link to this page
Your browser does not support the video tag.