My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 Mark Thomas & Co, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Under $60K
>
Agmt07 Mark Thomas & Co, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2013 11:23:06 AM
Creation date
5/9/2007 3:05:04 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Mark Thomas & Co. Inc.
PROJECT NAME
Agreement for Civil Design Services Redwood Shores Lagoon Maintenance Boat Ramp Extra Work #1
Date
6/15/2010
Amendment
Yes
Box
7213
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br /> <br />I ' <br /> <br /> <br />Mr, BriRllLee <br /> <br />Page 3 pf4 <br /> <br />412112010 <br /> <br />C) Construction Documents <br />The C~)1lstntctiol1 Documents will incorporate comments from the 100% submlttall'eview and <br />include preparation of the final PS&E docm~lents fo!' putting the project out to bid, <br /> <br />Delb'er(lb/es: <br /> <br />)- One (1) full-size reproducible set of tIle Final Construction Plans (Signed) <br />~ One (1) batf-size set oftbe Final. Constl'Uctic;:m Plans (Signed) <br />)> One (1) set of the Final Project Specifications <br />)> One (l) copy of thtf Final Construction Cost Estimate <br />)> A digital copy of the fmal Specificati9.ns and Contract Documents in ,PPF fonnat and R <br />digital copy of the drawings in CAD 01" PDP format <br /> <br />The estimated blldgetfor this w01'k Is $20,000. <br /> <br />3) Design SUllpOl't During Constt'uctlon <br />'York performed under this task would include providing supplemental support to the City for <br />constl'llction inquldes. Out" fee on1>' inoludes a nomhlal amount of support at this time) <br />consisting of attendance at one COllstl'llctiOll Kickoff nieetiug and up to four hours of City~ <br />SCheQliled meetings. The Construction Support phase will include the following items: <br /> <br />o Review alld pl'epal'e response to RFIs <br />o Review Contraotor Submittals and shop drawings for compatibility with design <br /> <br />The estimated budgetfor this work Is 34,000. <br /> <br />WORK ~OT INCLUDED IN PROPOSED DESIGN SERVICES <br /> <br />The following work is NOT included ill this proposal: <br /> <br />o Utility calculations (watet', sewer, drainage" etc.), <br />, Lot lines and street Rig1lt of\Vay surveys, <br />o Environmental Clearance Study 01" Analysis, <br /> <br />SERVICES AND FEE <br /> <br />AlIwol'k would be pe/formed alid billed 011 a time and materials b.asls based 011 actllal hOlll's wOJ*ed <br />to complete the tasks I'equested. The attached Fee Estimate BreakdowlI provides all estimate oj how <br />time would be spelll 011 this work, <br /> <br />Since tile original cOl1ll'act ($10,900) 1$ 81m active with app,'oxlmately $5,500 remallling.this amoullt <br />will be deducted from the $29,100 (i,e. $29,100 .. $5,~OO =. $23,600) per ihe City's request, The <br />difference 0/$23,600 would be the amount to complete the tasks olltlilled above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.