My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-05-21
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 1:01:07 PM
Creation date
5/17/2007 3:04:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
5/21/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.3A <br /> Page 4 <br /> continuaus loop trail around the island thus converting it into #wo, non-continuous trail <br /> segments leading to observation piatforms, and construction of a pedestrian bridge from Bair <br /> Island Road in praximity to an existing pubEic parking lot; and <br /> WHEREAS, in order ta best accammadate and coincide with the USFWS' planned <br /> trail alignrnent and access point changes on Inner Bair Is(and, Redwood City desires that the <br /> Bay Trail Proyect plan for a complementary realignment, to include Bay Trail designation of <br /> the two pfanned non-cantinuous traif "spurs," maintaining the existing Bay Trail spine <br /> alignment afong the western edge of Inner Bair Island, designating the eastern edge of Inner <br /> Bair Island including the bridge crossing to Bair Island Raad as Bay Trail spine, and <br /> eliminating Bay Trai! designation on the levee adjacent to Inner Bair Island as a result of the <br /> proposed trail access closure at Whipple Avenue; and <br /> WHEREAS, such a realignment and designation of Bay Trail on lnner Bair Island wiil <br /> provide the estimated 250,000 annuai visitors to Bair Island, from the community of Redwood <br /> City and the entire region, with enhanced recreational opportunities as well as more direct <br /> and environrnentally-sound access, and wilf be in concert with the USFWS' Bair Island <br /> restoration plans. <br /> NOW, THEREFORE, BE IT RES4LVED BY THE CITY CC1UNClL OF THE C1TY OF <br /> REDWOOD CITY AS FOLLOWS: <br /> That the Council requests the Bay Trail Project incorporate this realignment of <br /> the Bay Trail on Inner Bair {sland into the Bay Trail Plan. <br /> * � * <br /> ATTY/RE SO/F2ES 0.1704 <br /> 0503d7 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.