My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 Green Environment, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Under $60K
>
Agmt07 Green Environment, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2007 3:55:35 PM
Creation date
6/14/2007 8:27:51 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Green Environment, Inc
PROJECT NAME
Agreement for Professional Consulting Services
Date
6/13/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT ~ <br /> <br /> <br />Green . <br />Environment mc. <br />www.greenenvironme-nt.oom <br /> <br />195 Glenn Way, Suite 250 <br />San Carlos. CA 94070 <br />T 650.508.8018 <br />F 650.508.8176 <br /> <br />PROJECT PROPOSAL <br /> <br />Date: <br /> <br />May 1, 2007 <br /> <br />Project #: R07xxx <br /> <br />Client: <br /> <br />City of Redwood City <br />1017 Middlefield Road <br />Redwood City, CA 94063 <br /> <br />Attn: Mr. Brian Lee <br /> <br />Re: Monitoring and Reporting for NPDES Permit Compliance for <br />Groundwater Treatment System for City's Underground Parking <br />Facility at 850 Jefferson Avenue, Redwood City, CA <br /> <br />Introduction <br /> <br />The site known as "On Broadway" in Redwood City, California includes a parking <br />garage with two below grade parking levels. The garage is dewatered by a permanently <br />installed groundwater extraction system and volatile organic compounds (VOCs) in the <br />groundwater are removed by a carbon filtration system before the groundwater is <br />discharged to the storm sewer system. The discharge is permitted by the Regional Water <br />Quality C()ntr61Boaid(RWQCB). The permit requires perIodic monitoring and quarteiiy <br />reporting. <br /> <br />Proiect Scope <br /> <br />Task 1 : Monthly Monitoring and Quarterly Reporting <br /> <br />GEl will conduct monitoring of the treatment system from June 2007 through December <br />2007. GEl will collect one (1) influent, one (1) midstream and one (1) effluent <br />groundwater sample for subsequent laboratory analyses. The proposed sampling and <br />analytical schedule is provided in the tables below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.