My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 Green Environment, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Under $60K
>
Agmt07 Green Environment, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2007 3:55:35 PM
Creation date
6/14/2007 8:27:51 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Green Environment, Inc
PROJECT NAME
Agreement for Professional Consulting Services
Date
6/13/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~El <br />Green . <br />.. .. . Environment mc <br />W'N'V'i.gr'tl~'Ct1"ifQtlfn$1'lt..~Qm <br /> <br />Page 3 <br /> <br />"On Broadway" NPDES Permit Monitoring and Reporting proposal <br /> <br />Task 2: Additional sampling as required due to operational issues or as requested by the <br />City or RWQCB. <br /> <br />Proiect Schedule and Deliverables <br /> <br />Tasks <br /> <br />Deliverables <br /> <br />Completion Dates <br /> <br />l: Monitoring & Reporting <br /> <br />Two (2) quarterly and <br />one (l) annual report <br /> <br />Within 30 days <br />of the end of the <br />calendar quarter <br /> <br />2: As needed <br /> <br />Proiect Cost: <br /> <br />Task 1: $15,050 (to be billed in monthly increments of$2,150) <br /> <br />Task 2: to be billed on a time and material basis as per the attached Schedule of Charges, <br />with a Not-to-Exceed cost of $5,000 <br /> <br />Ms. Ellen Ackerman is the Project Manager. Mr. Jack Kantorczyk is the Technician. <br /> <br />Assumptions and Limitations <br /> <br />The City will pay the NPDESpeririif annual fee. <br /> <br />Design, installation and maintenance (except where specifically stated) of the treatment <br />system, piping or pumps are not included in this proposal. <br /> <br />Any waste disposal and storage costs, including treated water, will be paid directly by the <br />City. This estimate does not include a cost for temporary holding tanks during system <br />test periods. <br /> <br />Respectfully submitted, <br /> <br />Jta.,l~, C(}UMJ~ <br /> <br />Mark Green <br />President, Green Environment inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.