Laserfiche WebLink
7A <br /> ArTACHMErr��Page 20 <br /> • Water al1 active canstruc#ion areas at least twice daily and more often during <br /> windy periods; active areas adjacent to existing fand uses shall be kept damp at <br /> ali times, or shaii be treated with non-taxic stabiiizers or dust paifiatives. <br /> • Cover al! trucks hauling soil, sand, and other loose materiafs ar require all trucks <br /> to maintain at least two feet of freeboard. <br /> • Pave, apply water three times daily, or apply (non-toxic} soil stabi{izers on a!I <br /> unpaved access roads, parking areas, and staging areas at construction sites. <br /> • Sweep daily (preferably with water sweepers) al1 paved access roads, parking <br /> areas, and staging areas at construction sites; water sweepers shall vacuum up <br /> excess �r�t�r#o avoid runof�r�late� impacts tL v;rater c�;�aEityr. <br /> = Sweep �:reets �a;!�,� (preferably with water sweepers) if visi�le soi! ma±erial is <br /> carried onto adjacent pubiic strests. <br /> • Appiy non-toxic soil stabilizers to inactive constructian areas. <br /> • Enciose; cover, water twice aaiiy, or appiy non-foxic soii binders to exposed <br /> stockpiles (dirt, sar�d, etc.). <br /> • Limit traffic speeds on unpaved roads to 15 mph. <br /> « Install sandbags or other erasian control measures to prevent silt runoff to public <br /> roadways. <br /> • Replant vegetation in disturbed areas as quickfy as possible. <br /> Mitigation Impa�t Air-1.3: The fallowing are additional mitigation measures are <br /> recommended by the BAAQMD fio reduce engine exhaust emissions: <br /> • Use alternative fueled canstruction equipmen#. <br /> • Minimize idling time (5 minutes maximum). <br /> • Maintain properly tuned equipment. <br /> • Limit the hours of operation of heavy equipment and/or the amount oi equipment <br /> in use. <br /> Finding: Mitigation measures AIR-1.1 fhrough AIR-1.3 include all feasible <br /> measures for construction emissions identified by the BAAQMD for larg� sites. <br /> According to the BAAQMD threshold of significance for construction impacts, <br /> implementation of the measures would reduce construction related air quafity impacts or <br /> the project to a less-than-significant level. The City Council of the City of Redwood City <br /> adopts AIR-1.1 through AIR-'!.3 and finds that implementatian of these mitigation <br /> measures wi{I reduce construc#ion reiated air quality impacts of the project t� a less- <br /> than-significant level. <br /> D. GEOLUGY SOILS AND SEISMtCITY IMPACTS <br /> AttylResolReso.173$ 5 <br /> 082207 <br />