Laserfiche WebLink
10.A. - Page 8 of 21 <br />Bradford Creek Revetment Project <br />The project proposes to install natural landscaping along the Redwood Creek near the bridge on Main <br />Street to maintain the creek slope. The project will coincide with other creekside trail improvements <br />installed by the neighboring development project. Funding in the amount of $300,000 is proposed for FY <br />2019-20. <br />Green Infrastructure <br />A budget of $200,000 is proposed for FY 2019-20 to fund a green infrastructure (GI) pilot project focused <br />on identifying problematic drainage areas and constructing green infrastructure improvements to capture <br />and use stormwater. Funds will also be used to meet GI requirements in the National Pollution Discharge <br />Elimination System permit which regulates discharges from the City's storm system. <br />Storm Drain Creeks and Channels <br />The project involves repair, rehabilitation, and replacement of concrete lined sections of Redwood Creek <br />and its tributary branches. Funding in the amount of $700,000 is proposed for FY 2019-20 for ongoing <br />design along the Redwood Branch section. <br />h. Technology <br />Finance and Human Resources Software <br />Staff is in the process of replacing the City's existing finance, human resources, payroll, utility billing, <br />business license, and budget system with a new web -based system. Additional funding in the amounts of <br />$375,296 from the UUT and $617,000 each from the water and sewer capital funds is proposed in FY 2019- <br />20. <br />Library Automation Replacements <br />The ten self -checkout machines in use at all four library locations were purchased in 2011 and are nearing <br />end of life. The installation of these machines increased efficiency by using automation to allow library <br />circulation to grow significantly without adding staff, and sustaining this efficiency requires periodic <br />equipment upgrades. Funds in the amount of $130,000 are proposed in FY 2019-20 to begin phased <br />replacement of the machines. <br />i. Transportation <br />101184 Highway Interchange <br />The project involves reconstruction of the existing US 101 — Woodside Road interchange to ease <br />congestion, increase safety, and improve access for pedestrians and cyclists across Woodside Road and <br />US 101. The project is at 65% designed, with completion of the design anticipated by the end of 2019. No <br />additional funds are requested for FY 2019-20 but staff estimate a funding need of $25.5 million in future <br />years. <br />Roadway Pavement Management Program <br />The Roadway Management Program addresses ongoing roadway pavement repair and replacement <br />needs. Each year, streets are prepared for resurfacing with crack sealing and spot repairs before being <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />395 <br />