Laserfiche WebLink
10.A. - Page 9 of 21 <br />resurfaced with an "overlay," "cape seal," or "slurry seal". An additional $4,150,000 is proposed from <br />multiple funding sources for this program in FY 2019-20. <br />Stanford Neighborhood Street Enhancement <br />As part of their development agreement, Stanford University committed funding to improve liveability <br />and increase safety in three neighborhoods surrounding the new Stanford in Redwood City campus. A <br />community process was completed to identify and prioritize desired improvements for Phase 1 <br />implementation and design is 90% complete. Construction is planned for summer of 2019 and $450,000 <br />is proposed from the CIP towards this project in FY 2019-20. <br />Hopkins Traffic Calming <br />A conceptual design for the Hopkins Avenue Traffic Safety Project was developed through a year-long <br />community process and approved by the City Council in April 2018. Staff plan to award the pilot <br />construction contract in April 2019, and additional funding in the amount of $350,000 is proposed for FY <br />2019-20. <br />Transportation Demand Association <br />The project aims to study, design, adopt and implement a Transportation Management Association for <br />downtown Redwood City. The project will be developed in coordination with the Citywide Transportation <br />Plan and will include outreach to the downtown business community. Funding in the amount of $150,000 <br />is proposed for FY 2019-20. <br />Whipple Grade Separation <br />The project will physically separate the railroad tracks at Whipple Avenue from vehicular, bicycle, and <br />pedestrian roadway users by changing the grade of the railroad tracks or the affected roadways. Funding <br />in the amount of $75,000 is proposed for FY 2019-20. <br />j. Water <br />Distribution System Replacement Program <br />Additional funds in the amount of $5,300,000 is proposed in FY 2019-20 to fund ongoing replacement of <br />water main pipes throughout the city. Under this program, an average of 15 miles of pipe is replaced each <br />year. <br />Recycled Water Distribution Pump Station Improvements <br />The recycled water pump station located in Redwood Shores is the engine that drives recycled water <br />distribution from the wastewater treatment plant to customers in Redwood Shores and the main city. The <br />project proposes to replace existing pump station hardware, extend a potable water backup supply to the <br />pump station, and construct an enclosure around the distribution area to prevent contaminants from <br />entering recycled water during production. In FY 2019-20, $150,000 is proposed from the water enterprise <br />capital fund for this project. <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />396 <br />