My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-05-20 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-05-20 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:47:20 PM
Creation date
5/16/2019 5:27:10 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/20/2019
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
5/16/2019 5:32 PM
Modified:
5/16/2019 5:32 PM
Text:
http://www.redwoodcity.org/
ID:
2
Creator:
Created:
5/16/2019 5:32 PM
Modified:
5/16/2019 5:32 PM
Text:
javascript:void(0);
ID:
3
Creator:
Created:
5/16/2019 5:32 PM
Modified:
5/16/2019 5:32 PM
Text:
javascript:void(0);
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
682
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.E. - Page 2 of 5 <br />Since the initial contract amount was less than $60,000, the threshold for City Council approval, the City <br />Manager was authorized to approve the contract in mid-February 2018, and the Consultant began <br />providing services shortly thereafter. On December 17, 2018, the City Council approved Amendment No. <br />3 to the agreement for Engineering Inspection Services to increase the contract amount by $100,000. <br />Amendment No. 3 allowed the City to have two additional engineering inspectors to help with the <br />increased demand for inspection services needed during the summertime; that same demand for services <br />is expected to continue this year. <br />ANALYSIS <br />The amendment is proposed not -to -exceed $300,000.00, which covers 54 weeks of work time for one full- <br />time inspector to provide construction inspection services. Under this agreement construction inspection <br />services would be provided to several capital improvement projects and utility permits. Costs associated <br />with this agreement will be shared among the different capital improvement projects and utility permit <br />cost recovery accounts based on the actual time spent on each activity by the inspector. <br />The amended agreement budget will allow the current inspector to continue providing construction <br />inspection services through December 2019, and an additional inspector for a period of 6 months. The <br />budget will also allow the inspector to assist with the influx of utility encroachment permits and related <br />development projects. Construction inspection services will be charged to the following Capital <br />Improvement Projects and activities: <br />• Middlefield Road Streetscape Project (25%) <br />• Sewer Collection System Replacement Project (25%) <br />• California Water Tank, Pump Station, and Transmission Main Project (25%) <br />• Peninsula No. 2 Water Tank Seismic Improvement (20%) <br />• Utility encroachment permits and related development projects (5%) <br />FISCAL IMPACT <br />Funding has already been appropriated in the following funds: <br />Middlefield Road Streetscape Project <br />Fiscal Year 2018-2019 — Capital Outlay Fund —Middlefield Road Utility Underground/ Streetscape, which <br />has an available balance of $971,043 as of April 24, 2019. <br />Sewer Collection System Replacement: <br />Project Fiscal Year 2018-2019 — Sewer Fund Capital Projects — Collection System Replacement Project, <br />which has an available balance of $3,509,514 as of April 24, 2019. <br />California Water Tank, Pump Station, and Transmission Main Project: <br />Project Fiscal Year 2018-2019 — Water Fund Capital Projects — CA Tank and Pump Station, which has an <br />available balance of $5,126,134 as of April 24, 2019. <br />Peninsula No. 2 Water Tank Seismic Improvement: <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.