My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-05-20 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-05-20 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:47:20 PM
Creation date
5/16/2019 5:27:10 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/20/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
682
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.F. - Page 43 of 180 <br />• Employee count reports — run as needed when completing annual reports, costing, etc. <br />• Detailed termination report — run as needed when obtaining historical data <br />• Retirement listing/download by date range - excel <br />• Personal action form status listing — run as needed to audit PAFs and to complete process <br />facilitation <br />• Listing of employees exceeding maximum vacation accrual — each bargaining unit has a <br />maximum vacation accrual amount. Report run as needed to show which employee has <br />reached maximum and may have accruals frozen. Report used to respond to employee <br />requests, etc. <br />• Listing of employees with excess projected vacation accrual — run as needed, usually <br />annually in October <br />• Sick usage reports — report specifies date range, department, and bargaining unit. Run as <br />needed during labor negotiations, etc. <br />• Print/download contract employees with contract end date — report lists contract termination <br />dates. Run as needed to verify which contracts need renewals <br />• Worksheet of casual employees under 18 — run quarterly to identify casual employees under <br />age 18 in order to obtain work permits and track time/reporting to bargaining unit(s) per <br />Memorandum of Understanding (MOU) <br />• Past due evaluations (2 reports run) <br />• Position control report <br />• Casuals paid under certain hourly salary — run as needed regarding minimum wage <br />• Temporary upgrade end dates <br />• Casual hours report — 12 months rolling, auto email each pay period <br />• Contract employees hours report — auto email each pay period <br />• Permanent Part Time (PPT) hours report - auto email each pay period <br />• Budget status report — expense distribution report <br />• Custom project budget reports — run monthly <br />• Service Employees International Union (SEIU) reports <br />2.7 interface Development <br />During Stage 2 — Configuration & Prototypes, the project team will review the City's current <br />integration points as listed in the table below from the RFP. During the F03 Gap Analysis effort <br />the project team will determine the scope of development that will be required to meet those <br />interface requirements. The PO4 Project Scope document will be updated to include the approved <br />interface development items. <br />Area <br />Interface <br />Project <br />Phase <br />Finance <br />Wells Fargo <br />1 <br />Finance <br />Turbo Data Systems <br />1 <br />Finance <br />Collection Bureau ofAmerica <br />1 <br />Finance <br />Muniservices <br />1 <br />Finance <br />Tel staff <br />2 <br />Finance <br />Cost Recovery <br />1 <br />EXHIBIT STATEMENT OF WORK <br />ATTY/AGR/2019.118/CHERRYROAD ERP IMPLEMENTATION SERVICES <br />REV: 05-13-19 PR Page 35 of 172 <br />A-21 <br />150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.