My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-05-20 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-05-20 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:47:20 PM
Creation date
5/16/2019 5:27:10 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/20/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
682
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.F. - Page 72 of 180 <br />Number: F04 <br />Name: Conduct Prototype 2 <br />Stage: 2 - Config & Prototypes <br />Track: 2 - Functional <br />Type: Milestone <br />Description: Conduct Prototype 2 will encompass approximately 30% of the requirements and representa <br />mi dpoi nt prototype with the purpose of focus i ng on high priority a nd complex Redwood City requirements and <br />business processes. Initial City-specificdata loads, chartof accounts and configurations will be utilized. Designated <br />requirements wi I I be demonstrated showing functions, features, and capabilities of the Cloud Applications. The <br />revi ew wi I I be demonstrated by CherryRoad functional consultants. <br />Sub-Deliverables/Milestones: There will be a Conduct Prototype 2 milestone for each project phase, <br />resulting in the following sub -deliverables: <br />• F04.1 Conduct Prototype 2 - Phase 1 <br />• F04.2 Conduct Prototype 2 - Phase 2 <br />• F04.3 Conduct Prototype 2 - Phase 3 <br />Format: NA <br />Redwood City Role: The City will be responsible for completing the following tasks: <br />• Participate in planning sessions to determine requirements to be included in F04 Conduct <br />Prototype 2 prototype sessions <br />• Attend prototype sessions <br />• Provide feedback in the prototype sessions <br />• Review and Accept deliverables and outcome from the prototype sessions <br />CherryRoad Role: CherryRoad will be responsible for completing the following tasks: <br />• Prepare prototype sessions <br />• Conduct CherryRoad lead prototype sessions <br />Acceptance Criteria: The F04 Conduct Prototype 2 milestone is complete for each project phase when the <br />following tasks have been completed: <br />1. CherryRoad has published agendas for the prototype sessions listing the specific functions, <br />features and capabilities to be included in the prototype. <br />2. CherryRoad has conducted the prototype sessions in accordance with the published agendas <br />3. The Conduct Prototype 2 Milestone will serve as the functional unit test of the requirements <br />included in the prototype sessions. <br />Deliverable/Milestone Assumptions: <br />1. F04 Conduct Prototype 2 prototype sessions will provide an in-depth review of the functions, <br />features, and capabilities of the cloud application to meet the City's high priority and complex <br />requirements and business processes. The City specific configuration and data will be limited to <br />that which is completed as part of the D03 Release 2 Prepare Prototype 2 Environment milestone. <br />2. City requirements not scheduled to be included in the F04 Conduct Prototype 2 prototype sessions <br />will be deferred to F05 Conduct Prototype 3 prototype sessions, or a later point in the project <br />phase, as mutually agreed upon by the City and CherryRoad. <br />EXHIBIT A APPENDIXA DELIVERABLE DEFINITIONS <br />A -A - 11 <br />ATTY/AGR/2019.118/CHERRYROAD ERP IMPLEMENTATION SERVICES <br />REV: 05-13-19 PR Page 64 of 172 179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.