Laserfiche WebLink
CONSTRUCTION <br />TESTING SERVICES <br />RATE AND FEE SCHEDULES <br />Below is a fee schedule for an estimated 600 working hours (onsite only) for a two-year contract period to perform <br />the services outlined in the RFSOQ-RFP. This does not include project management, engineering or laboratory <br />testing. <br />Name/Role <br />Days <br />TotalNumber <br />Hours <br />0• <br />Unit Rate <br />Role <br />Geotechnical Inspections <br />and Testing — Compaction <br />90 days <br />360 hours <br />$95 <br />$34,200 <br />Testing for Various Utility <br />Projects (d07.) <br />Speciallnspection and <br />Material Testing — Caltrans <br />Tech, Welding Inspections, <br />60 days <br />240 hours <br />$95 <br />Concrete/Shotcrete, Pile <br />$22,800 <br />Driving, Soil NWIITieback <br />Inspections (401%) <br />Total <br />$57,000 <br />ATTY/AGR/2019.111/CONSTRUCTION TESTING SERVICES INC. <br />REV: 05-02-19 PR Page 1 of 6 <br />