My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-06-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-06-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:41:57 PM
Creation date
6/20/2019 6:01:33 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
6/20/2019 6:05 PM
Modified:
6/20/2019 6:05 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
791
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.G. - Page 1 of 4 <br />/<�ik <br />Redwood <br />CitylCallifornia <br />Faunded 1867 <br />A,&/ <br />DATE: June 24, 2019 <br />STAFF REPORT <br />To the Honorable Mayor and City Council <br />SUBJECT: Award of contract— 2019 Microsurfacing Project <br />RECOMMENDATION <br />From the City Manager <br />By motion, award the standard form construction contract (Section 00520) for the 2019 Microsurfacing <br />Project to American Asphalt Repair & Resurfacing Co., Inc. of Hayward, CA for their responsive and <br />responsible low bid of $702,652.00, and authorize the City Manager to increase the contract amount, if <br />necessary, up to 10% above the original contract amount. <br />STRATEGIC INITIATIVE <br />Transportation <br />BACKGROUND <br />Roadway pavements require repair and preventive maintenance for a variety of reasons, including <br />deterioration due to aging, traffic loads, exposure to the elements, and intrusive tree roots. The Roadway <br />Management Program inventories, assesses, and tracks maintenance of the City's roadways. Roadway <br />segments are then prioritized for resurfacing based on the needs of the entire street network. It is more <br />economical to preserve pavements in good condition rather than delaying repairs, as aging pavements <br />deteriorate faster, and associated repair costs increase rapidly. <br />Each year, projects are selected to optimize pavement conditions and to make the most efficient use of <br />limited resources. At times, paving work on specific streets is shifted by 1-2 years to allow for planned <br />underground utility (water, sewer, and storm drain) projects to proceed first. This minimizes utility <br />projects working on newly resurfaced streets. <br />The purpose of the 2019 Microsurfacing Project is to preserve and extend the serviceable life of Marine <br />Parkway, Vera Avenue and Alameda de las Pulgas by protecting the pavement surfaces with a thin layer <br />of asphalt material to create a microsurfacing seal. Microsurfacing is a cost-effective preventive <br />maintenance measure that provides a new wearing surface, seals and protects the underlying pavement <br />from the elements, and extends the life of the pavement. Prior to the application of the microsurfacing, <br />deteriorated sections of pavement are replaced and larger cracks in the surface are filled with sealant. <br />After applying the microsurfacing, temporary pavement markings and striping will be installed. After <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.