My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-06-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-06-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:41:57 PM
Creation date
6/20/2019 6:01:33 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
6/20/2019 6:05 PM
Modified:
6/20/2019 6:05 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
791
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.H. - Page 2 of 6 <br />provided for the actual products by the manufacturers for varying warranty periods per the contract <br />documents. <br />The project spanned over two years due to the multitude of conflicts encountered during construction. <br />The long lead time of traffic signal equipment, the unforeseen subsurface condition, and the conflicting <br />information from utility service providers all contributed to the longer -than -expected project duration. <br />The increase in project cost addressed the following items: utility conflicts that required redesign of storm <br />drain lines and traffic signal conduits. <br />FISCAL IMPACT <br />This project was fully funded in the FY 2018-2019 Adopted Budget; no budget adjustments are required. <br />ENVIRONMENTAL REVIEW <br />This activity is not a project under California Environmental Quality Act (CEQA) as defined in CEQA <br />Guidelines, section 15378, because it has no potential for resulting in either a direct or reasonably <br />foreseeable indirect physical change in the environment. On January 23, 2017, the City Council <br />determined when it awarded the contract that the project was exempt under CEQA Guidelines Section <br />15301 (Existing Facilities) because it involved the minor alteration of existing streets with negligible or no <br />expansion of use. <br />PUBLIC NOTICE <br />Public Notification was achieved by posting the agenda, with the agenda items being listed, at least 72 <br />hours prior to the meeting. <br />ALTERNATIVES <br />The City Council may choose not to accept the project or authorize the release of bonds and retention, <br />however, this would be contrary to the terms of the contract and public contracting code. <br />ATTACHMENTS <br />Attachment A: Project Location Map <br />Attachment B: Typical Improvements <br />REPORT PREPARED BY: <br />Alex Chan, Assistant Engineer <br />achan@redwoodcity.org <br />(650) 780-7307 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.