Laserfiche WebLink
panic hardware and alarms shall be installed at or adjacent to gates between private and <br />public parking to allow the safest emergency egress path of travel. [SDR] [ENGINEERING] <br />48. Shoring for Excavations - No tiebacks shall extend into the public right of way or onto <br />adjacent properties without the written agreement of the City and/or private property <br />owner. Any tie -backs within the City's right of way shall be de -tensioned prior to permit <br />sign -off and/or project acceptance. [COA] [ENGINEERING] <br />Fire and Safetv <br />49. Addressing and Access -The following requirements apply: [COA] [FIRE] <br />a. Addresses must be logical, sequential numbers, i.e. First Floor 101, 102, 103, <br />Second Floor 202, 203, 204, as opposed to F303, G401, etc.. <br />b. Floor plan maps shall be submitted with unit numbers at all entrances, excluding <br />fire exits. <br />C. Provide a key pad with 24 hour access code for public safety personnel at the main <br />entrance, as opposed to just RFID readers or similar devices <br />Construction -Related Activities <br />50. Verification for Dimensions - All dimensions, including building location on the site, <br />setbacks, building height, etc. shall be verified by a licensed surveyor. A survey report <br />shall be provided to the Building Inspector for review and approval. [COA] [BUILDING] <br />51. Hours of Construction - On -Site Construction activity is permitted between 7:00 a.m. <br />and 8:00 p.m. Monday through Friday, except as permitted on weekends by the Building <br />Official, and shall adhere to the City's Noise Ordinance. If possible, the noisiest <br />construction activities would be scheduled for daytime hours when the ambient noise <br />levels are highest. [SDR] [BUILDING] <br />52. Construction Sign - Prior to the start of any construction work, including demolition, <br />install at least one 36" x 48" (minimum) construction sign in a visible location along the <br />project frontage for the duration of construction. The sign shall include, at minimum, the <br />following information: project name & address, elevation or rendering, construction <br />manager (name, phone number), anticipated completion (season, year), and the City's <br />permitting website http://nermits.redwoodcity.org [COA] [PLANNING] <br />53. Construction Meetings - The applicant is required to contact the Permit Counter <br />(650.780.7350) to schedule the following meetings prior to or during construction. <br />[COA] [BUILDING] <br />a. Pre -Submittal - Prior to building permit submittal, schedule a <br />pre -submittal meeting with Building, Planning, Engineering and Fire staff to discuss <br />the permitting process and submittal requirements. <br />ATTY/RESO.0016/PC RESO APPROVING PERMITS FOR 610 WALNUT STREET <br />REV: 02-20-19 PR <br />Page 13 of 16 <br />