My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC19-01 PC Reso 0016 Approving Permits for 610 Walnut Street
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2019
>
Reso PC19-01 PC Reso 0016 Approving Permits for 610 Walnut Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 2:49:27 PM
Creation date
6/24/2019 2:45:17 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
2/19/2019
Text box
ID:
1
Creator:
Created:
6/24/2019 2:45 PM
Modified:
6/24/2019 2:45 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXVTRIMFE
ID:
2
Creator:
Created:
6/24/2019 2:45 PM
Modified:
6/24/2019 2:45 PM
Text:
http://www.seq.org/+uploaded/file_1677.pdf
ID:
3
Creator:
Created:
6/24/2019 2:45 PM
Modified:
6/24/2019 2:45 PM
Text:
http://www.redwoodcity.org/home/showdocument?id=2002
ID:
4
Creator:
Created:
6/24/2019 2:45 PM
Modified:
6/24/2019 2:45 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH38WASYRE
ID:
5
Creator:
Created:
6/24/2019 2:45 PM
Modified:
6/24/2019 2:45 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.241STIMTRTR
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fees <br />The following fees must be paid in full prior to issuance of the building permit unless otherwise <br />described below. <br />5. Transportation Impact Fee - Pay a Traffic Impact Fee for the net new trips resulting <br />from the proposed project. [SDR] [ENGINEERING] <br />6. Affordable Housing Impact Fee - Pay an Affordable Housing Impact Fee for the net new <br />commercial square footage from the proposed project, estimated at $1,050,560. <br />[SDR] [HOUSING] <br />7. Parking In -Lieu Fee - As proposed by the applicant, pay a Parking In -Lieu Fee of $25,000 <br />per space deficient from the shared parking requirement (61 spaces). [COA] [PLANNING] <br />8. School Impact Fee - For new commercial or industrial construction, pay a School Impact <br />Fee to the Sequoia Union High School District. Information regarding this fee may be <br />obtained by contacting the Sequoia Union High School District at (650) 369-1411. <br />[SDR] [SCHOOL DISTRICT] <br />9. Water and Sewer Fees - Pay applicable water, recycled water, and wastewater -related <br />fees as outlined on the City's website. [SDR] [ENGINEERING] <br />10. Notice of Fees Protest - The applicant may protest any fees, dedications, reservations, <br />or other exactions imposed by the City as part of the approval or as a condition of <br />approval of this development. Per California Government Code Section 66020, this 90 - <br />day protest period has begun as of the date of the approval of this application. <br />[SDR] [OFFICE OF THE CITY ATTORNEY] <br />Landscaping and Site Improvements <br />11. Water -Efficient Landscaping -Provide a landscaping and irrigation plan conforming to <br />the California Water -Efficient Landscape Ordinance (AB 1881), including an automatic <br />irrigation system (drip, micro -spray, or bubblers) with a rain sensor, and show these <br />measures on the building permit plans. [COA] [PLANNING] <br />12. Tree Protection - Provide tree protection measures for ordinance -sized trees near the <br />project and show these measures on the building permit plans. [COA] [PLANNING] <br />13. Street Trees - A total of three street trees shall be planted along Bradford Street frontage <br />and five street trees along the Walnut Street frontage. The tree species and location will <br />be determined by the City Engineer and Planning Manager. These improvements shall <br />be included as part of the building permit submittal package. Newly planted trees shall <br />be both irrigated and maintained by the applicant. [SDR] [PLANNING] <br />14. Stormwater Runoff - Post -construction runoff into the storm drain shall not exceed pre - <br />construction runoff levels. The applicant's design professional shall evaluate the <br />project's impact to the City's storm drainage system and shall substantiate their <br />ATTY/RESO.0016/PC RESO APPROVING PERMITS FOR 610 WALNUT STREET <br />REV: 02-20-19 PR <br />Page 6 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.