Laserfiche WebLink
Impact US -6: Implementation of the Project would not result in a determination <br />by the wastewater treatment provider which serves or may serve the project that it <br />does not have adequate capacity to serve the project's projected demand in addition <br />to the provider's existing commitments. <br />Impact US -7: The Project, in combination with past, present, and reasonably <br />foreseeable projects, would result in less -than -significant cumulative impacts with <br />respect to wastewater service. <br />Impact US -8: The Project would be served by a landfill with sufficient permitted <br />capacity to accommodate the Project's solid waste disposal needs. <br />Impact US -9: Implementation of the Project would comply with federal, state, and <br />local statutes and regulations related to solid waste. <br />Impact US -10: The Project, in combination with past, present, and reasonably <br />foreseeable projects, would result in less -than -significant cumulative impacts with <br />respect to solid waste service. <br />Impact US -11: Implementation of the Project would not require or result in the <br />construction of new stormwater drainage facilities or expansion of existing <br />facilities, the construction of which could cause significant environmental effects. <br />Impact US -12: The Project, in combination with past, present, and reasonably <br />foreseeable projects, would result in less -than -significant cumulative impacts with <br />respect to stormwater infrastructure. <br />Impact US -13: Implementation of the Project would not result in a substantial <br />increase in natural gas and electrical service demands, and would not require new <br />energy supply facilities and transmission infrastructure or capacity enhancing <br />alterations to existing facilities. <br />Impact US -14: Implementation of the Project would not result in inefficient, <br />wasteful, and unnecessary energy consumption. <br />Impact US -15: The Project, in combination with past, present, and reasonably <br />foreseeable projects, would result in less -than -significant cumulative impacts with <br />respect to energy conservation. <br />B. Findings Regarding Potentially Significant Impacts. <br />The following potential environmental impacts of the Broadway Plaza <br />Project were determined to be potentially significant and to require mitigation measures to avoid <br />their effects or to reduce their severity, as set forth in Chapter 4 of the DEIR, as incorporated into <br />the EIR. The City Council concurs with the conclusions in the DEIR, as incorporated into the EIR, <br />and makes the following findings with respect to such potentially significant impacts. <br />1. Air Quality Impact AQ -2a: Without the implementation of the Air District's best <br />management practices, uncontrolled fugitive dust (PM10 and PM2.5) could expose areas that <br />are downwind of the project site to air pollution from construction activities. <br />Mitigation Measures. EIR Mitigation Measure AQ -2a will be implemented for <br />ATTY/RESO.0036/PC RESO CERTIFYING THE EIR — SOBRATO <br />REV: 04-29-19 PR <br />Page 15 of 29 <br />