My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC19-05 PC Reso 0036 Certifying the EIR - Sobrato
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2019
>
Reso PC19-05 PC Reso 0036 Certifying the EIR - Sobrato
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 2:51:58 PM
Creation date
6/24/2019 2:46:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
4/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Alternative Location. Although initially considered as a potential Project alternative, <br />development of an alternative site was rejected as infeasible during the EIR scoping <br />process, because several of the applicant's and City's objectives for the Project are specific <br />to this location. See DEIR at pg. 6-5. Therefore, this alternative was not evaluated in the <br />EIR and is not discussed further here. <br />Reduced Office Alternative. An alternative that would have included development of <br />100,000 square feet of office space, rather than the 456,000 square feet included in the <br />proposed Project, was also considered early in the environmental review process. But this <br />alternative was rejected because it would not avoid the significant and unavoidable traffic <br />impacts of the proposed Project. See DEIR at pg. 6-5. Therefore, the Reduced Office <br />Alternative was not evaluated in the EIR and is not discussed further here. <br />Increased Residential Alternative. Under the Increased Residential Alternative, the office <br />component of the proposed Project would not be developed; instead, the east half of the <br />Broadway Block would be developed with 520 residential units (400 market -rate and 120 <br />affordable) in two 6 -story buildings and one 5 -story building (see Figure 6-1). The west <br />half of the Broadway Block would be developed with housing as under the proposed <br />Project. In total, 1,040 residential units would be developed on-site. This alternative would <br />include the same public plazas, retail space, and child care component as the proposed <br />Project. Development of the Bay Block would be the same as the proposed Project. The <br />Increased Residential Alternative was evaluated in the DEIR's Alternatives Analysis <br />(DEIR at 6-15 through 6-23) and is discussed further below. <br />No Office Alternative. Under the No Office Alternative, the office component of the <br />proposed Project would not be developed. The entire Broadway Block would be <br />developed with 520 residential units (400 market -rate and 120 affordable). This analysis <br />assumes that the units would be built in six 3 -story buildings (that is, half the height of <br />residential buildings in the proposed Project), with a one -level underground garage under <br />each building. Thus, the site plan for this alternative would resemble that for the <br />Increased Residential Alternative shown in Figure 6-1, except with reduced building <br />heights as noted. This alternative would include the same public plazas, retail space, and <br />the child care component as the proposed Project. Development of the Bay Block would <br />be the same as the proposed Project. The No Office Alternative was evaluated in the <br />DEIR's Alternatives Analysis (DEIR at 6-23 through 6-31) and is discussed further <br />below. <br />The primary purpose of an EIR's alternative analysis is to identify and evaluate possible <br />alternatives to the proposed project that can avoid or substantially lessen the project's significant <br />environmental effects while still achieving the basic objectives of the project. The City and the <br />Project applicant have determined the following objectives to be their objectives for the proposed <br />Project (DEIR at pg. 3-8): <br />Redevelop an existing strip mall on the Woodside Road and Broadway corridors with attractive <br />and desirable amenities and housing. <br />Meet and exceed the City's Affordable Housing Ordinance. <br />ATTY/RES0.0036/PC RESO CERTIFYING THE EIR — SOBRATO <br />REV: 04-29-19 PR <br />Page 25 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.