My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC19-04 PC Reso 0037 Recommending the Project - Sobrato
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2019
>
Reso PC19-04 PC Reso 0037 Recommending the Project - Sobrato
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 2:52:29 PM
Creation date
6/24/2019 2:46:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
4/24/2019
Text box
ID:
1
Creator:
Created:
6/24/2019 2:47 PM
Modified:
6/24/2019 2:47 PM
Text:
mailto:nmurguia@redwoodcity.org
ID:
2
Creator:
Created:
6/24/2019 2:47 PM
Modified:
6/24/2019 2:47 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH24NORE_ARTIIEXUNNO_DIV3CO_S24.32TILI
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
64. Fire Alarm Systems Required - UL Central Station fully addressable fire alarm systems are <br />required in all buildings meeting NFPA 72. Provide plans and voltage drop calculations for the <br />design of these systems. [SDR] [FIRE] <br />65. Emergency Escape and Rescue Openings - All sleeping rooms must all be provided with <br />emergency escape and rescue openings in accordance with CBC 1030. Confirm the design of the <br />project includes compliant openings and those openings have ladder access for use by the fire <br />department in an emergency. Show the point of ladder access on the fire department access <br />plans. The proposed construction type of the residential buildings was not indicated on the <br />plans. Due to the elevation changes to the top of the podium, and the difficulty in accessing all <br />of the sleeping room windows with ladders, it is recommended that the construction type for <br />the residential structures be Type IIIA or IIA which would allow for the elimination of the <br />rescue and escape window requirements. [SDR] [FIRE] <br />66. Premises Identification (Address Numbers) - Indicate on the plans where the premises <br />identification (address) will be located and the size (minimum 12") in an illuminated and <br />contrasting background facing the street from which the building takes the address. [SDR -CFC <br />505] [FIRE] <br />67. Gurney Accommodating Elevator Requirement - Elevators in buildings that are four stories <br />or more shall provide for fire department emergency access to all floors. At least one elevator <br />car in each building shall be of such a size and arrangement to accommodate an ambulance <br />gurney 24 inches by 84 inches with not less than 6 -inch radius corners, in the horizontal, open <br />position and shall be identified by the international symbol for emergency medical service. The <br />symbol shall not be less than 3 inches high and shall be placed inside on both sides of the hoist - <br />way door frame. [SDR -CBC 3002.4.] [FIRE] <br />68. Portable Fire Extinguishers Required - Portable fire extinguishers, with a minimum <br />classification of 2A: 1013C are required to be permanently installed in all buildings within 75 feet <br />of travel from all portions of the building in compliance with NFPA 10 and CFC 906. [SDR] [FIRE] <br />Construction -Related Activities <br />69. Verification for Dimensions -All dimensions, including building location on the site, setbacks, <br />building height, etc. shall be verified by a licensed surveyor. A survey report shall be provided <br />to the Building Inspector for review and approval. [COA] [BUILDING] <br />70. Sales and Use Taxes - Applicant shall use good faith efforts to register with the Board of <br />Equalization to create an ID prior to project construction and operation. This maximizes the <br />City's allocation of sales and use taxes associated with project construction. Contact Nancy <br />Murguia, Finance Department, at (650) 780-7097 or <br />nmurguia(@redwoodcity.org. [COA] [FINANCE] <br />71. Hours of Construction - On -Site Construction activity is permitted between 7:00 a.m. and 8:00 <br />p.m. Monday through Friday, except as permitted on weekends by the Building Official, and <br />shall adhere to the City's Noise Ordinance. If possible, the noisiest construction activities would <br />be scheduled for daytime hours when the ambient noise levels are highest. [SDR] [BUILDING] <br />72. Construction Sign - Prior to the start of any construction work, including demolition, install at <br />least one 36" x 48" (minimum) construction sign in a visible location along the project frontage <br />ATTY/RESO.0037/PC RESO RECOMMENDING THE PROJECT —SOBRATO <br />REV: 04-29-19 PR <br />Page 19 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.