My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15781
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2019
>
Res19 15781
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 12:37:06 PM
Creation date
7/9/2019 11:48:47 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
roads, fallen trees or other debris, or other hazards may act as barriers). Bear in mind that if a <br />major earthquake has occurred, staff will likely need to confirm the status of their homes and <br />family and take steps to ensure the immediate safety of their household as applicable, before <br />responding. <br />Any major earthquake will almost certainly cause power outages and loss of communication <br />equipment. Minor earthquakes may potentially cause similar events. During the initial response phase, <br />backup power supplies and communication equipment may be needed until normal service is restored. <br />Once the emergency response organization has received an overall picture of conditions in Redwood <br />City and the extent of the emergency, the following steps must be taken: <br />❑ Decide whether to activate the EOC, and if so to what level. Note that the primary EOC may be <br />damaged or accessible, so an alternative location may be necessary. <br />❑ Mobilize all necessary staff. <br />❑ Conduct a rapid triage of the city, identifying the areas most in need of an immediate response. <br />Deploy available emergency response staff to these areas with the highest priority. As more <br />resources become available and issues requiring immediate response are addressed, deploy <br />resources to lower -priority areas and tasks. Impress upon responders that they must not stop <br />at the first emergency encountered. <br />❑ If the initial survey or other early reports identify natural gas or hazardous material leaks, <br />immediately notify PG&E or the facility owner as appropriate. Evacuate any persons at risk of <br />harm from indirect hazards. <br />❑ Activate emergency shelters and distribute information to members of the public about shelter <br />locations. <br />❑ Evacuate persons needing immediate assistance, such as persons on life support systems, or at <br />medical or care facilities. <br />❑ Conduct a more detailed survey of the damage, with an emphasis on filling in gaps or following <br />up on items flagged during the rapid response. Note that any aftershocks or emerging issues <br />(e.g. fires caused by natural gas leaks) may cause conditions in some areas to be substantially <br />different than identified during the initial survey. <br />❑ Evacuate buildings that are considered unsafe for occupancy and tag these buildings so they <br />can be easily recognized. <br />❑ Update the priority status of different areas and emergency conditions to reflect new <br />intelligence from the detailed survey and other staff and deploy available resources <br />accordingly. <br />❑ Continue to update the priority status of different areas and emergency conditions, based on <br />reports from emergency responders, and deploy available resources to respond to the <br />remaining highest priority situations. <br />Direction and Control <br />For general information about direction and control during an earthquake event, see the Concept of <br />Operations section in the Basic Plan. <br />D-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.