Laserfiche WebLink
6.E. - Page 16 of 16 <br />Exhibit Table B (3)-2 <br />NOT TO EXCEED FEE SUMMARY <br />(3) Field Surveys <br />DIRECT LABOR <br />$121,044.14 <br />I',laikup 2', <br />$2.420 68 <br />Total Subconsultants <br />Hours <br />Rate <br />Total <br />Project Manager <br />6 <br />99.45 <br />$596.70 <br />DPM/Highway Design Manager <br />4 <br />103.73 <br />$414.92 <br />Project ControWCIA Manager <br />8 <br />78.76 <br />$630.08 <br />Survey Manager 1 Senior Land Surveyo <br />348 <br />68.97 <br />$24,001.56 <br />Survey CADD Technician <br />78 <br />52.44 <br />$4,090.32 <br />Total Direct Labor <br />444 <br />Belshire (Waste Profile/Disposal) <br />$29,733.58 <br />Labor Escalation (0 months assumed) <br />$0.00 <br />0.000% <br />$0.00 <br />Total Direct Labor (escalated) <br />$0.00 <br />Potholing/Elec Probing <br />$29,733.58 <br />Overhead <br />$0.00 <br />135.09% <br />$40,167.09 <br />Fee <br />$17,280.00 <br />10% <br />$6,990.07 <br />Total Labor <br />$17,625.60 <br />EXPENSES <br />$76,890.74 <br />SUBCONSULTANTS <br />Subtotal Subconsultants <br />$121,044.14 <br />I',laikup 2', <br />$2.420 68 <br />Total Subconsultants <br />$123.465.03 <br />SUBCONTRACTED COSTS <br />Environmental Drilling <br />$0.00 <br />Environmental Testing <br />$0.00 <br />Environmental Traffic <br />$0.00 <br />Geotech Drilling <br />$0.00 <br />Geo tech Testinq <br />$0.00 <br />Geotech Traffic <br />$17,280.00 <br />Cal Safety <br />$0.00 <br />Pitcher Drilling <br />$0.00 <br />Fugro <br />$0.00 <br />Exploration Geoservices <br />$0.00 <br />Penecore (HazMat Drilling) <br />$0.00 <br />Belshire (Waste Profile/Disposal) <br />$0.00 <br />Subtronic (HazMat Util locate) <br />$0.00 <br />Subtronic (Geo Util locate) <br />$0.00 <br />Enthalpy (HazMat lab) <br />$0.00 <br />Potholing/Elec Probing <br />$0.00 <br />Aerial Survey Data <br />$0.00 <br />Traffic Counts <br />$0.00 <br />Subtotal Expenses <br />$17,280.00 <br />Markup 2% <br />$345.60 <br />Total Expenses <br />$17,625.60 <br />EXPENSES <br />Title Reports <br />$0.00 <br />Misc. Printing <br />$0.00 <br />Postage, Travel. Misc. <br />$0.00 <br />ODC 13 <br />$0.00 <br />ODC 14 <br />$0.00 <br />ODC 15 <br />$0.00 <br />ODC 16 <br />$0.00 <br />Subtotal Expenses <br />$0.00 <br />Markup 0% <br />$0.00 <br />Total Expenses <br />$0.00 <br />TOTAL PROJECT COST <br />$217,981.37 <br />Note. Position rates are an anticipated average for each position category <br />Specific rates are determined by actual salary at time of service <br />Rate differences do not affect the total not to exceed contract amount. <br />REV: 07-03-19 DZ <br />ATTY/AGR.Amend No. 3/AECOM 101/84 PS&E Page 13 of 13 <br />124 <br />