My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res96 12819
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
1990-1999
>
1996
>
Res96 12819
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:38:19 PM
Creation date
12/16/2002 10:22:57 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
7/15/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MITIGATION MONITORING PROGRAM <br /> FOR THE ELECTRONIC ARTS HEADQUARTERS MASTER PLAN <br /> <br />1.0 INTRODUCTION <br /> <br /> When an Environmental Impact Report ("EIR") identifies measures to <br />avoid or mitigate potentially significant effects on the environment, a mitigation <br />monitoring or reporting program must be prepared. <br /> <br /> Tb.e EIR for the El~o."Jc .axts H~'~4q'~ters M~t~,r Plan ("Pro3ect") <br />consists of the EIR for the General Plan for the Redwood Peninsula ("Redwood <br />Peninsula EIR") and the Addendum prepared for the Project. <br /> <br /> The following section identifies (1) mitigation measures for the Proj eot; (2) <br />whether each mitigation measure will be enforced through the terms of the <br />Development Agreement ("DA") or the Planned Development Permit ("PDP"); <br />(3) when the measures will be enforced (e.g., prior to the issuance of building <br />permits); and (4) the department responsible for enforcing the condition (e.g., <br />Planning Department, Building Department.) <br /> <br />2.0 MITIGATION MONITORING PROGRAM <br /> <br />2.1 Geotechnical Problems: Increased Exposure to Seismic Risk <br /> <br /> 2.1.1 Mitigation Measure: Comply with all recommendations of the <br /> Project geotechnical report. <br /> <br /> 2.1.2 Enforcement: PDPcondition. <br /> 2.1.3 Timing: During construction. <br /> 2.1.4 Responsible Department: Community Development. <br /> <br /> 2.2 Geotechnical Problems: Settlement <br /> <br /> 2.2.1 Mitigation Measure: Comply with all recommendations of the <br /> Project geotechnical report. <br /> <br /> 2.2.2 Enforcement: PDP condition. <br /> 2.2.3 Timing: During construction <br /> 2.2.4 Responsible Department: Community Development. <br /> <br /> E×HIBITB <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.