Laserfiche WebLink
2.3 Air Pollution: Short-Term Construction Impacts~ Visual Impacts <br /> During Construction <br /> <br /> 2.3.1 Mitigation Measure: Conduct final grading work in compliance <br /> with the regulations contained in the Redwood City Grading Ordinance. <br /> <br /> 2.3.2 Enforcement: PDP condition. <br /> <br /> 2.3.4 Responsible Department: Community Development. <br /> <br />2.4 Air Pollution: Short-Term Construction Impacts; Visual Impacts <br /> During Construction <br /> <br /> 2.4.1 Mitigation Measure: Implement dust containment measures during <br /> project excavation, grading and construction activities. <br /> <br /> 2.4.2 Enforcement: PDP condition. <br /> 2.4.3 Timing: During construction. <br /> 2.4.4 Responsible Department: Community Development. <br /> <br /> 2.5 Water Pollution and Hydrololly <br /> <br /> 2.5.1 Mitigation Measure: Meet drainage and stormwater runoff <br /> regulations of the Redwood City Engineering Division; meet NPDES <br /> Guidelines and regulations relevant to storm waste management. <br /> <br /> 2.5.2 Enforcement: PDP condition. <br /> 2.5.3 Timing: During construction. <br /> 2.5.4 Responsible Department: .Community Development. <br /> <br /> 2.6 Noise: Increased Noise During Construction <br /> <br /> 2.6.1 Mitigation Measure: Comply with the City's noise ordinance for <br /> construction (No. 2013).. <br /> <br /> 2.6.2 Enforcement: PDP condition. <br /> <br /> <br />