My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-08-26 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-08-26 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:00:32 AM
Creation date
8/23/2019 8:26:02 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/26/2019
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
8/23/2019 8:28 AM
Modified:
8/23/2019 8:28 AM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1. - Page 2 of 3 <br />increased safety lighting, accessible ADA pedestrian signals, emergency vehicle pre-emption system, and <br />bicycle lanes. <br />The project was constructed in accordance with City Specifications and to the satisfaction of the City's <br />Engineering and Transportation Division. The contract required a faithful performance bond and a labor <br />and material bond that can be released at this time. Contract change orders totaling $49,913 in reduced <br />costs were issued for final quantity adjustments and changes to the project scope. The final contract <br />amount is $1,512,771, approximately 3 percent less than the initial contract amount. <br />FISCAL IMPACT <br />The Middlefield Road and Woodside Road Intersection Improvements Project was included in the Capital <br />Improvement Program Budget in the Gas Tax Construction Fund (FY 2013-14), Traffic Mitigation Fees Fund <br />(FY 2013-14), and Capital Outlay Fund (FY 2017-18) and the grant award was included in the FY 2012-13 <br />revenue budget for the Various Transportation Grants Fund. <br />ENVIRONMENTAL REVIEW <br />Accepting the project and releasing bonds and retention is not a project under the California Environmental <br />Quality Act (CEQA) as defined in the CEQA Guidelines, section 15378 because it has no potential for <br />resulting in either a direct or reasonably foreseeable indirect physical change in the environment. The City <br />determined when it awarded the contract that the project was exempt under CEQA Guidelines Section <br />15301 (Existing Facilities). The California Department of Transportation is the lead agency for NEPA <br />compliance and has determined that the project is a Categorical Exclusion under 23 CFR 771.117(c)(3). <br />PUBLIC NOTICE <br />Public Notification was achieved by posting the agenda, with the agenda items being listed, at least 72 <br />hours prior to the meeting <br />ALTERNATIVES <br />The City Council may choose not to accept the project or authorize the release of bonds and retention, <br />however, this would be contrary to the terms of the contract and public contracting code. <br />ATTACHMENTS <br />There are no attachments. <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.