My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-08-26 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-08-26 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:00:32 AM
Creation date
8/23/2019 8:26:02 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/26/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.E: - Page 15 of 22 <br />08/27/2018 FEDERAL EMERGENCY MANAGEMENT AGENCY REC-01 <br />16:57:07 <br />RECORD OF ENVIRONMENTAL CONSIDERATION (REC) <br />Project ID: HMG 4308-228-12 <br />Title: Redwood City Peninsula 2 Tank Seismic <br />Environmental Lawl <br />Executive Order Status Description Comments <br />updated June, 30, 201 B. Based on the scope of <br />work, the potential emissions from project <br />activities are clearly below Lde minimisL <br />thresholds for the General Conformity Rule. <br />Thus, the project is exempt from a conformity <br />determination. See Condition. - sortega3 - <br />07/25/2018 23:10:35 GMT <br />Completed Coordination required with applicable state <br />administering agency - Review concluded <br />Coastal Barrier Resources Act Completed Project is not on or connected to CBRA Unit <br />(CBRA) or otherwise protected area - Review <br />concluded <br />Clean Water Act (CWA) Completed Project would not affect any water of the U.S. <br />- Review concluded <br />Coastal Zone Management Act Completed Project is not located In a coastal zone area See Attached - sortega3 - 0712512018 22:44:27 <br />(CZMA) and does not affect a coastal zone area - GMT <br />Review concluded <br />Executive Order 11988 - Completed No effect on floodplainlflood levels and Per Flood Insurance Rate Map (FIRM) panel <br />Floodplains project outside floodplain - Review concluded 06081GOI88E, dated 10/16112, the project is <br />located outside the Special Flood Hazard Area <br />(100 -year floodplain, base floodplain). See <br />Attached - sortega3 - 07/25/2018 21:49:23 GMT <br />Executive Order 11990 - Completed No effects on wetlands and project outside See Attached. - sortega3 - 07/2512018 23:29:44 <br />Wetlands wetlands - Review concluded GMT <br />Executive Order 12898 - Completed Low income or minority population in or near The project when completed will result in a <br />Environmental Justice for Low project area beneficial impact to all populations. - sorteg93 - <br />Income and Minority Populations 07/25/2018 23:33:16 GMT <br />Completed No disproportionately high and adverse <br />impact on low Income or minority population - <br />Review concluded <br />Endangered Species Act (ESA) Completed No listed species and/or designated critical See Attached No Effect Memo. - sortega3 - <br />habitat present in areas affected directly or 08/08/2018 22:26:34 GMT <br />indirectly by the federal action - Review <br />concluded <br />Farmland Protection Policy Act Completed Project does not affect designated prime or <br />(FPPA) unique farmland - Review concluded <br />Fish and Wildlife Coordination Completed Project does not affect, control, or modify a <br />Act (FWCA) waterwaylbody of water - Review concluded <br />NOTE: All times are GMT using a 24-hour clock. Page 2 of 4 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.