My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-10-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-10-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 11:54:52 AM
Creation date
10/18/2007 2:39:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
10/22/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1C <br />Page 18 <br /> <br />Dates: Duration of project <br /> <br />MIG will provide overall project coordination and will participate in up to seven (7) two-hour project team <br />meetings with Redwood City to prepare for workshops, provide information and direction on the project, <br />and get feedback on development of ongoing work products. These meetings will also provide an <br />opportunity to discuss desired outcomes for the outreach process; review draft workshop content; and set <br />preliminary guidelines for the public workshop process. <br /> <br />C2: Existing Conditions Report <br />Deliverahle # 12: Exis ting Conditions Report <br /> <br />Due ~y: November 2007 <br /> <br />The MIG Team will analyze the existing conditions information gathered from the data and the initial site <br />tour. OP AC will also conduct an analysis of the existing condition of the pedestrian bridge in the project area. <br />As appropriate, Redwood City will provide base maps in digital format, and MIG \,v11; create maps of the <br />project area. These analyses and maps will be used in discussions with staff, during public presentations, and <br />for development concepts and strategies to improve mobility. <br /> <br />MIG will prO/Jide one full-color electronic copy ~r the rep0l1 to the City for distribution, and will use the report as the baJi,rfor <br />developin~~ lvorkJhop materials and approaches. <br /> <br />C3: Transportation Needs Assessment Study <br />Dates: November 2007 to February 2008 <br /> <br />Led by Fehr & Peers with support from OPAC, the l\lIG Team will conduct a comprehensive transportation <br />needs assessment to identify barriers to mobility in Fair Oaks and propose preliminary design options to <br />address these barriers. This study will examine all elements of transportation and mobility in Fair Oaks, from <br />bicycle routes to pedestrian crossings to transit access to traffic engineering at interchanges and along major <br />corridors. The needs assessment will also take special note of design concerns affecting the pedestrian bridge <br />in the study area based on OPAC's expertise in this area. <br /> <br />As part of this study, Fehr & Peers '.ViII analyze existing conditions information gathered from the data and <br />the initial site tour. Pehr & Peers will gather available data including trafftc counts and forecasts from recent <br />studies, collision records from the City of Redwood City, as well as general observations gained during site <br />visits and the site tour. Fehr & Peers, with City consultation, will also conduct pedestrian and bicycle counts <br />at the Woodside Road intersection with Middlefield Road, and at the pedestrian bridge. These analyses and <br />maps will be used in discussions with staff, during public presentations, and for development concepts and <br />strategies to improve mobility, <br /> <br />C4: Transportation Needs Assessment Report <br />DelitJerable #13: Needs Assessment Report <br /> <br />Due I?J: February 2008 <br /> <br />This report will summarize the results of the Transportation Needs Assessment Study and will propose clear <br />next steps to help guide the community process as workshops begin and the public becomes involved in the <br />project. Fehr & Peers will assess transportation conditions and needs-based data collected and site <br />observations conducted during the tasks described above. Fehr & Peers will identify key opportunities for <br />improvements to bicycle and pedestrian circulation, as well as transit access, including an analysis of at-grade <br />crossing opportunities at Woodside/1v1iddlefield, during which Fehr & Peers \,\ill identify potential lane and <br />signal conflgurations and the potential traffle impacts that could result. It is envisioned that the needs <br />assessment will help to frame the discussion of improvement options. <br /> <br />MIG lVillprovicle of/eful/-tvlor elettronic coJ?} ~f the Needs A,.r.re.rJment Report to the Cityfor review, and 1vill romplete one <br />round ~ledit.r b~fore.finalii!ng the document. <br /> <br />MOORE IACOFANO GOLTSMAN, INC. I REDWOOD CITY FAIR OAKS MOBILITY PLAN SCOPE OF WORK <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.