My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-10-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-10-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 11:54:52 AM
Creation date
10/18/2007 2:39:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
10/22/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1C <br />Page 17 <br /> <br />oj'meeting .rpa,'eJ. MIG Jllill be n:Jponsible f01' providing snmks, beverages, and child care at the large workJ"hop. At the smalier <br />workshop,r, MIG wi/I provide J"nackJ" and beverageJ aJ appropriate and lvill provide adivi(y matm'czls to occu!!y children. <br /> <br />Bl1: Workshop Report, Round 3 <br />Delil/erable #9: Round 3 Workshop Report <br /> <br />Due ~)': Three weeks after final Round 3 workshop <br /> <br />MIG will prepare a workshop summary that documents the key results of Workshops #7-8. This report will <br />include summary-level results of the workshop as well as detailed photographs or transcriptions of all <br />wallgraphics, activity results, comment cards received, and other documentation of the workshops. The <br />report will also provide specific direction to the Project Team on any changes to the plan suggested by the <br />community. <br /> <br />MIG will provide one full-mlor eledronic mpy of the report to the City. <br /> <br />B1Z: Workshop Activity Materials (Workshop 9) <br /> <br />Deliverable #10: Round 4 Workshop Materials <br /> <br />Due b: October 2008 <br /> <br />MIG will develop innovative, hands-on materials tailored to support the final workshop, including <br />presentation materials, comment cards, and up to six (6) appl'Opriate maps for the workshop. <br /> <br />MIG willprollide all material,r to the Ctj) infull-color electronic format at leaJt ten dcryJ b~/ore the event (or earh'er aJ needed if <br />agreed upon with the Ciry in advance). The Ciry Ivill be n:sponJibleforprinting and plottil~g materials a.r needed <br /> <br />B13: Workshop Round Four (Workshop 9) <br /> <br />Date.r: October 2008 <br /> <br />The final workshop will consist of one large two-hour workshop to present the draft plan. The MIG Team <br />will present draft streetscape plans and mobility impl'Ovement strategies based on the months of work the <br />community has done. Residents will have a chance to comment on the designs, suggest changes or <br />improvements, and shape the final product <br /> <br />MI G Will provide no fewer than four J"tqflmembersjor the three-hour large Jllorkshops, no fewer than three steiff member.r for the <br />two-hour large JJJorkJ'hops, and no fewer than two .rtallmembersfor the smaller meetingJ and community mmJersations. At all <br />))JorkshopJ", at least one SpamJ"h-.rpeaking J"tr:if.f member will be available. MIG will collaborate with the City to identifY <br />appropriate meeting spal;e for each workshop. The C(ty will be re.rponJ"iblefor al'!.Y rental jees or other costs as.ro,'iated with tbe use <br />q/meeting J-pcu'CJ'. MIG Jvil! be responJible forprovidif{p' .macks, beverages, and chiM care at the lar;ge work.rhop.At the J"maller <br />work.rhops, M.IG will provide .macks and beverages as appropriate and JI/ill provide adiviry maten'cdr to occupy children. <br /> <br />B14: Workshop Report, Round 4 <br />Deliverable #11: Round 4 Workshop Report <br /> <br />Due b.y: Three weeks after final Round 4 workshop <br /> <br />MIG will prepare a workshop summary that documents the key results of Workshop #9. 111is report will <br />include summary-level results of the workshop as well as detailed photographs or transcriptions of all <br />wallgraphics, activity results, comment cards received, and other documentation of the workshops. The <br />report will also provide specific direction to the Project Team on any changes to the plan suggested by the <br />community, <br /> <br />T~5K c: <br /> <br />A.~AL Y~15 & REPORTS <br /> <br />Cl: Project Coordination, Administration & Team Meetings <br /> <br />MOORE IACOFANO GOL TSMAN, INC. I REDWOOD CITY FAIR OAKS MOBILITY PLAN SCOPE OF WORK <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.