My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-09-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-09-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:33:55 PM
Creation date
9/5/2019 5:14:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/9/2019
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
9/5/2019 5:15 PM
Modified:
9/5/2019 5:15 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 11 of 15 <br />The proposed building has residential units on all floors with garage access from Jackson Avenue. A <br />lobby/leasing area would be on the ground floor fronting EI Camino Real. <br />COMMENTS SOUGHT DURING THE STUDY SESSION <br />During the study session, members of the City Council and members of the public may wish to comment <br />on overall impressions of the project at this time, project elements that should be supported and project <br />elements that should be revisited by the Developer. <br />FISCAL IMPACT <br />All costs associated with consideration of the project will be borne by the Applicant. <br />ENVIRONMENTAL REVIEW <br />An Environmental Impact Report (EIR) is required for the proposed project. <br />PUBLIC NOTICE <br />On August 30, 2019, at least ten days before to the hearing date, notice of the City Council hearing was <br />mailed to owners and tenants within 300 feet of the project site, sent to interested parties, placed in the <br />Redwood City Daily Journal, and posted on the website. <br />FUTURE STEPS <br />When the Draft EIR is complete, it will be released for a public comment and review period of 45 - <br />days. During this time, the City will hold a public hearing with the Planning Commission to receive <br />comments on the Draft EIR. After the conclusion of the review period, the staff and consultant team <br />will evaluate the comments and prepare Responses to Comments (RTC) and the Final EIR. The proposed <br />project be considered by the Architectural Advisory Committee, Transportation Advisory Committee, <br />Historic Resources Advisory Committee, and Planning Commission. The City Council will act on the project <br />entitlements and Final EIR. <br />ATTACHMENTS <br />Attachment A: Public Comment <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.