Laserfiche WebLink
6.C. - Page 18 of 33 <br />the Project are submitted to the CITY retained reprographics company before the <br />date of the first advertisement for bidding the Project. <br />2.6 Pre -Bid Conference(s). The PM shall conduct pre-bid conferences, including thejob <br />walk(s), if one is required or scheduled in the bid documents. The pre-bid <br />conference shall include without limitation: <br />(ix) description of the Project; <br />(x) description of the process for bidding and award of the contract(s) for <br />construction of the Project; and, <br />(A) requirements relating to bonds, insurance coverages and similar <br />administrative requirements. The job walk shall provide bidders with an <br />overview of the site of the Project and an understanding of the physical <br />limitations and other constraints affecting the work of the Project or portions <br />thereof. <br />The PM shall: <br />(i) maintain a list of bidders and bidders' representatives attending a job walk; <br />and, <br />(ii) record and transcribe minutes of the pre-bid conferences and job walk(s). <br />The bidders list shall be delivered by the PM to the CITY within twenty-four <br />(24) hours of a job walk. Minutes maintained by the PM shall be issued to all <br />bidders who have theretofore obtained the bid documents, the CITY, the <br />Architect and other parties as directed by the CITY. Where discussion <br />changes the project requirements, PM shall coordinate with Architect to <br />ensure that comments are incorporated into contract documents. <br />2.7 Opening/Reading of Bid Proposals. The PM shall assist the CITY in the public <br />opening, reading, and recording of bids. During bid opening, the PM shall record <br />the results of each bidding; including identities of the bidders, the amount <br />proposed by each bidder, and amounts proposed for bid alternates. The PM <br />shall identify the apparent low bidder(s). If the Project was not subject to a <br />Request for Qualification (RFQ pre -qualification process), the PM shall review <br />the apparent low bidders' Statement of Qualifications to determine if the low <br />bidder meets the minimum qualification requirements. <br />2.8 Review of Bid Proposals. Recommendations for award of construction contract. <br />The PM shall review submitted bid proposals to determine: <br />(i) whether the bidder submitting the bid proposal is a responsible bidder; and, <br />(ii) whether the bid proposal is responsive to material bidding requirements. <br />2.9 Bid Recommendations. PM shall make recommendations tothe CITY regarding: <br />REV: 08-28-19 PR <br />rejection of a bid proposal based upon the "non -responsibility" of the bidder; <br />rejection of a bid proposal for non -responsiveness to material bidding <br />requirements; <br />rejection of a bid proposal for any other reason; <br />rejection of all bid proposals; and, <br />ATTY/AGR.2019.216/Gilbane (Page 15 of 30) <br />