My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-09-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-09-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:33:55 PM
Creation date
9/5/2019 5:14:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/9/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.C. - Page 18 of 33 <br />the Project are submitted to the CITY retained reprographics company before the <br />date of the first advertisement for bidding the Project. <br />2.6 Pre -Bid Conference(s). The PM shall conduct pre-bid conferences, including thejob <br />walk(s), if one is required or scheduled in the bid documents. The pre-bid <br />conference shall include without limitation: <br />(ix) description of the Project; <br />(x) description of the process for bidding and award of the contract(s) for <br />construction of the Project; and, <br />(A) requirements relating to bonds, insurance coverages and similar <br />administrative requirements. The job walk shall provide bidders with an <br />overview of the site of the Project and an understanding of the physical <br />limitations and other constraints affecting the work of the Project or portions <br />thereof. <br />The PM shall: <br />(i) maintain a list of bidders and bidders' representatives attending a job walk; <br />and, <br />(ii) record and transcribe minutes of the pre-bid conferences and job walk(s). <br />The bidders list shall be delivered by the PM to the CITY within twenty-four <br />(24) hours of a job walk. Minutes maintained by the PM shall be issued to all <br />bidders who have theretofore obtained the bid documents, the CITY, the <br />Architect and other parties as directed by the CITY. Where discussion <br />changes the project requirements, PM shall coordinate with Architect to <br />ensure that comments are incorporated into contract documents. <br />2.7 Opening/Reading of Bid Proposals. The PM shall assist the CITY in the public <br />opening, reading, and recording of bids. During bid opening, the PM shall record <br />the results of each bidding; including identities of the bidders, the amount <br />proposed by each bidder, and amounts proposed for bid alternates. The PM <br />shall identify the apparent low bidder(s). If the Project was not subject to a <br />Request for Qualification (RFQ pre -qualification process), the PM shall review <br />the apparent low bidders' Statement of Qualifications to determine if the low <br />bidder meets the minimum qualification requirements. <br />2.8 Review of Bid Proposals. Recommendations for award of construction contract. <br />The PM shall review submitted bid proposals to determine: <br />(i) whether the bidder submitting the bid proposal is a responsible bidder; and, <br />(ii) whether the bid proposal is responsive to material bidding requirements. <br />2.9 Bid Recommendations. PM shall make recommendations tothe CITY regarding: <br />REV: 08-28-19 PR <br />rejection of a bid proposal based upon the "non -responsibility" of the bidder; <br />rejection of a bid proposal for non -responsiveness to material bidding <br />requirements; <br />rejection of a bid proposal for any other reason; <br />rejection of all bid proposals; and, <br />ATTY/AGR.2019.216/Gilbane (Page 15 of 30) <br />
The URL can be used to link to this page
Your browser does not support the video tag.